Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

558 Briar Hill Ave

The City of Toronto has 5 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services

    Replace sanitary piping and install new backwater valve.

    Applied Jun 8, 2017 · issued Jun 8, 2017 · completed Jun 21, 2017 · Permit 05 137620 DRN

    Closed
  • Plumbing

    Plumbing - 2 storey rear addition - Addition(s)

    Applied Oct 4, 2005 · issued Oct 4, 2005 · Permit 05 137620 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - 2 storey rear addition - Addition(s)

    Applied Oct 4, 2005 · issued Oct 27, 2005 · Permit 05 137620 HVA

    Inspections under way
  • Small residential project · Addition(s)

    2 storey rear addition

    Applied May 31, 2005 · issued Jun 9, 2005 · Permit 05 137620 BLD

    Inspections under way
  • Plumbing · Unknown

    Install fixtures in basement: 1 w.c., 1 w.b., 1 shower, 1 w.t. (declaration of use included) /lm

    Applied Apr 30, 1996 · issued Apr 30, 1996 · completed Jun 8, 2026 · Permit 96 015689 PLB

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 483 St Clements Ave · Minor variance

    To construct a new two-storey detached dwelling with a front porch, rear deck, and basement walkout. NOTE: This application was previously deferred at the Committee of Adjustment hearing on October 6, 2025.

    170 m away · filed Aug 25, 2025 · Approved

  • 483 St Clements Ave · Minor variance

    To construct a new two-storey detached dwelling with a front porch and a rear deck.

    170 m away · filed Jun 30, 2025 · Approved

  • 262 Cortleigh Blvd · Minor variance

    To construct a new three-storey dwelling with a rear porch, second and third floor balconies, and an integral garage.

    210 m away · filed Apr 1, 2025 · Approved

  • 150 Hillhurst Blvd · Minor variance

    To construct a new three storey detached dwelling.

    130 m away · filed Feb 28, 2025 · Approved

  • 110 Hillhurst Blvd · Minor variance

    To propose additional habitable space below grade.

    220 m away · filed Jan 20, 2025 · Approved

  • 254 Cortleigh Blvd · Minor variance

    Proposal to construct a new dwelling.

    230 m away · filed May 14, 2024 · Approved

  • 186 Hillhurst Blvd · Minor variance

    To construct a new dwelling.

    210 m away · filed May 10, 2024 · Approved

  • 110 Hillhurst Blvd · Minor variance

    Proposal for a new dwelling.

    220 m away · filed Mar 12, 2024 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.