Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

56 Batavia Ave

The City of Toronto has 8 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Revision to as built location and size of select windows on north and south elevations.REVISION 2 - add a 3rd floor dormerProposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes new 2nd and 3rd floor additions, 1 storey rear/side addition, underpinning, interior alterations, front basement walkout, rear deck and front 3rd floor balcony. See also 21 156404 ZZC.

    Applied Feb 16, 2023 · issued Apr 17, 2023 · Permit 21 212127 BLD (revision 03)

    Revision issued
  • Heating and ventilation

    REVISION - add a 3rd floor dormerHVAC - Proposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes new 2nd and 3rd floor additions, 1 storey rear/side addition, underpinning, interior alterations, front basement walkout, rear deck and front 3rd floor balcony. See also 21 156404 ZZC.

    Applied Oct 24, 2022 · issued Nov 7, 2022 · completed Jun 12, 2025 · Permit 21 212127 HVA (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes new 2nd and 3rd floor additions, 1 storey rear/side addition, underpinning, interior alterations, front basement walkout, rear deck and front 3rd floor balcony. See also 21 156404 ZZC.

    Applied Aug 9, 2022 · issued Aug 24, 2022 · completed Jun 12, 2025 · Permit 21 212127 HVA

    Closed
  • Small residential project · Multiple projects

    REVISION 2 - add a 3rd floor dormerProposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes new 2nd and 3rd floor additions, 1 storey rear/side addition, underpinning, interior alterations, front basement walkout, rear deck and front 3rd floor balcony. See also 21 156404 ZZC.

    Applied Apr 22, 2022 · issued May 17, 2022 · Permit 21 212127 BLD (revision 02)

    Revision issued
  • Small residential project · Multiple projects

    REVISION - remove stepped footingand sloped basemtment floor in southwest corner, remove proposed fire shutter in kitchen, instead transfer window in same wallProposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes new 2nd and 3rd floor additions, 1 storey rear/side addition, underpinning, interior alterations, front basement walkout, rear deck and front 3rd floor balcony. See also 21 156404 ZZC.

    Applied Dec 1, 2021 · issued Jan 13, 2022 · Permit 21 212127 BLD (revision 01)

    Revision issued
  • Small residential project · Multiple projects

    Proposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes new 2nd and 3rd floor additions, 1 storey rear/side addition, underpinning, interior alterations, front basement walkout, rear deck and front 3rd floor balcony. See also 21 156404 ZZC.

    Applied Sep 14, 2021 · issued Nov 23, 2021 · Permit 21 212127 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes new 2nd and 3rd floor additions, 1 storey rear/side addition, underpinning, interior alterations, front basement walkout, rear deck and front 3rd floor balcony. See also 21 156404 ZZC.

    Applied Sep 14, 2021 · issued Nov 23, 2021 · completed Jun 12, 2025 · Permit 21 212127 PLB

    Closed
  • Drains and site services

    Drain - Proposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes new 2nd and 3rd floor additions, 1 storey rear/side addition, underpinning, interior alterations, front basement walkout, rear deck and front 3rd floor balcony. See also 21 156404 ZZC.

    Applied Sep 14, 2021 · issued Nov 23, 2021 · completed Jun 12, 2025 · Permit 21 212127 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 43 Mould Ave · Minor variance

    To construct a new fourplex.

    170 m away · filed May 10, 2026 · Approved

  • 45 Mariposa Ave · Minor variance

    To construct a third storey front addition and a second and third storey rear addition above the existing dwelling.

    90 m away · filed Dec 12, 2025 · Approved

  • 82 Pritchard Ave · Minor variance

    To construct a laneway suite and a carport.

    100 m away · filed Nov 7, 2024 · Approved

  • 84 Corbett Ave · Minor variance

    To construct a one-storey addition along the west side of the existing detached garage.

    160 m away · filed Sep 16, 2024 · Approved

  • 58 Corbett Ave · Minor variance

    To maintain the existing second storey front platform.

    150 m away · filed Aug 27, 2024 · Approved

  • 8 Batavia Ave · Minor variance

    To construct a new laneway suite with two residential units.

    170 m away · filed Feb 26, 2024 · Application withdrawn

  • 18 Mould Ave · Minor variance

    To legalize and maintain an attached accessory structure (shed) to the rear of the existing dwelling.

    170 m away · filed Feb 7, 2024 · Refused

  • 31 Mariposa Ave · Minor variance

    To make interior alterations to accommodate two secondary suites.

    110 m away · filed Jan 10, 2024 · Approved

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.