Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

56 Cloverdale Rd

The City of Toronto has 3 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Unknown

    Excavate for basement entrance at rear also excavte to lower basement floor.

    Applied Oct 29, 1998 · issued Feb 18, 1999 · Permit 98 023324 BLD

    Inspections under way
  • Plumbing · Unknown

    Install new fixtures in basement: 1 water closet, 1 wash basin 1 bath tub, 1st. Floor: 1 water closet, 1 wash basin, 1 bath tub. Cost included under permit no. 364550

    Applied Aug 23, 1994 · issued Aug 23, 1994 · completed Feb 13, 2026 · Permit 94 019937 PLB

    Closed
  • Small residential project · Unknown

    Replace second floor deck also build uncovered platform at rear amd make interior alterations double fee

    Applied Aug 23, 1994 · issued Aug 23, 1994 · completed Sep 18, 2026 · 1 home added · Permit 94 019936 BLD

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 77 Union Street

    39 storeys · 1,951 homes · Mixed use

    280 m away · Site plan · Under review · filed Apr 25, 2022

    Under review
  • 1799 St Clair Avenue West

    45 storeys · 1,151 homes · Mixed use

    300 m away · Site plan · Under review · filed Apr 29, 2022

    Under review
  • 2 Union Street

    Not stated in the file

    350 m away · Site plan · Under review · filed Dec 15, 2022

    Under review
  • 2-80 Union Street

    49 storeys · 1,364 homes · Residential

    350 m away · Subdivision · Under review · filed Nov 9, 2021

    Under review
  • 290 Old Weston Road

    27 storeys · 321 homes · Residential

    400 m away · Site plan · Under review · filed Apr 29, 2022

    Under review
  • 100 Union Street

    37 storeys · Mixed use

    450 m away · Site plan · Under review · filed Aug 24, 2022

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 88 Howick Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (including a basement level), a rear first floor deck with stairs, and a rear second floor rooftop deck.

    120 m away · filed Aug 10, 2026 · Hearing scheduled

  • 7 Howick Ave · Minor variance

    To legalize and to maintain the rear second storey addition (including a staircase leading to this addition), to the existing two-storey semi-detached dwelling, that was constructed without an authorized building permit.

    250 m away · filed Apr 24, 2026 · Approved

  • 333 Old Weston Rd · Minor variance

    To legalize and to maintain the existing one-and-one-half-storey detached dwelling (municipally known as 333 Old Weston Road), and to reconstruct the existing rear one-storey addition, and side (south) ground floor deck and stairs, which were constructed without an authorized building permit. Also, to reconstruct the front porch stairs, and to convert the basement into a second dwelling unit. The existing second residential building on this lot (municipally known as 102 Ford Street), and the existing Place of Worship (municipally known as 331 Old Weston Road) will be maintained and unaltered.…

    240 m away · filed Mar 31, 2026 · Approved

  • 47 Cloverdale Rd · Minor variance

    To alter the existing one-storey ancillary building (detached garage), in the rear yard, abutting Cloverdale Road, by constructing a complete second storey addition (to contain one garden suite). There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit within the ancillary building), and two parking spaces within the altered ancillary building.

    30 m away · filed Jul 30, 2025 · Approved

  • 113 Silverthorn Ave · Minor variance

    To alter the existing one-storey ancillary building (detached one-car garage) by constructing a rooftop deck (above the existing garage), and rooftop access stairs at the west side of the building.

    240 m away · filed Jul 15, 2025 · Refused

  • 66 Silverthorn Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by replacing the front yard parking space with an exterior staircase (which will lead to all levels and the rooftop).

    130 m away · filed Jun 24, 2025 · Approved

  • 24 Silverthorn Ave · Minor variance

    To convert the existing one-and-one-half-storey detached dwelling into a three-storey triplex by constructing a front one-storey addition, a partial rear one-storey addition, second and third storey additions, front and rear second storey balconies, a front third storey balcony, a rear ground floor deck and a rear basement walkout. Also, to convert the existing one-storey ancillary building (detached garage, in the rear yard) into a two-storey garden suite by constructing a second storey addition and removing the existing parking space.

    160 m away · filed Jul 25, 2023 · Approved

  • 364 Osler St · Minor variance

    To alter the existing two-storey detached dwelling by constructing a third storey addition, and a front third storey balcony. Three new secondary suites will be installed, totalling four dwelling units within the altered dwelling.

    240 m away · filed Apr 19, 2023 · Application withdrawn

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.