Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

56 Heath St E

The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Residential building permit · New building

    Alter plans as approved under file 420785 by constructing basement entrance at front.

    Applied Mar 26, 2001 · issued Jul 23, 2001 · Permit 01 121621 CMB (revision 01)

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 51 Heath St E · Consent

    To obtain consent to sever an existing residential lot into two residential lots and to create new easements/rights-of-way.

    60 m away · filed May 4, 2026 · Approved

  • 48 Heath St E · Minor variance

    To alter the existing three-storey detached dwelling by reconstructing the rear first floor deck (balcony) with stairs, and to construct a rear at-grade stone patio.

    40 m away · filed Apr 16, 2026 · Approved

  • 1 Heath St E · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 1032-2022) for a mixed-use development comprised of a 13-storey building (Building 1) and three towers (Tower 1 with 44-storeys, Tower 2 with 38-storeys and Tower 3 with 25-storeys) connected by a shared podium on the lot by reallocating a proportion of residential density from Building 1 to Tower 1, increasing the building height of Tower 1 from 44-storeys (144 m) to 46-storeys (161.2 m), decreasing the height of Building 1 from 13-storeys (53.5 m) to four-storeys (25 m), increasing the height and projections o…

    220 m away · filed Sep 23, 2025 · Approved

  • 50 Heath St E · Minor variance

    To alter the existing two-storey ancillary building (semi-detached garage in the rear yard) by constructing a rear partial second storey addition. This building will be converted into one garden suite (containing an integral garage, and habitable space on the first and second levels). There will be a total of two residential dwelling units on this lot (one dwelling unit within the main house and one dwelling unit within the ancillary building).

    30 m away · filed Aug 17, 2024 · Approved

  • 1639 Yonge St · Minor variance

    To alter the existing three-storey building (The York School) by constructing a rear basement walkout with terrace, and interior alterations to reconfigure some classroom spaces, convert the existing storage space in the basement into a relocated cafeteria, and convert the existing cafeteria on the third storey into a second gymnasium.

    250 m away · filed Jan 5, 2024 · Approved

  • 64 Alvin Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a third storey side (east) dormer. The existing one-storey ancillary building (garage) in the rear yard, will be maintained and unaltered.

    140 m away · filed Nov 21, 2023 · Approved

  • 100 Heath St E · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a complete third storey addition with a rear rooftop deck (above the second storey), a rear ground floor covered deck, and a new front porch (the existing porch will be demolished).

    230 m away · filed Sep 21, 2023 · Approved

  • 39 Heath St E · Minor variance

    To construct a new four-storey detached dwelling (duplex) with an integral garage, a front porch with stairs, a rear ground level patio, a rear second storey deck, a rear third storey balcony, and a front fourth storey balcony. There will be two residential dwelling units on the lot (duplex).

    90 m away · filed Sep 12, 2023 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.