Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

562 Church St

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Designated structure · Sign building permit related

    In conjunction with a two storey building on the premises, proposal to erect and display one illuminated wall sign containing static copy on the first and second storey north elevation wall. The proposed wall sign is 5.0 metres vertically by 12.0 metres horizontally at a height of 6.49 metres above grade.**Astral Out of Home**

    Applied Jun 13, 2016 · issued Sep 13, 2016 · completed Jun 13, 2018 · Permit 16 172304 DST

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 508 Church St · Minor variance

    To permit the existing entertainment place of assembly (nightclub) use within the two-storey commercial building.

    210 m away · filed Jun 25, 2026 · Approved

  • 20 Maitland St · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 88-2023(OLT)) for the 40-storey mixed-use building (which is currently under construction), by increasing the residential gross floor area, building height (41-storeys; 123.5 m to 127.6 m and 129.2 m to 133.6 m), and the height of the elevator overrun projection. There will be a total of 516 residential dwelling units on this site.

    230 m away · filed Feb 4, 2026 · Approved

  • 26 Maitland St · Minor variance

    To alter the development standards for the 40-storey mixed-use building (as approved under Site Specific Zoning By-law 88-2023) by increasing the total number of residential dwelling units, the overall and residential gross floor area, the building height, and the maximum projection height of an elevator overrun. Also, to reduce the total number of residential dwelling units with 3 or more bedrooms, the required amenity space, and the total number of residential visitor parking spaces. The new 45-storey mixed-use building (excluding the mechanical penthouse) will have a total of 572 residenti…

    220 m away · filed Feb 28, 2025 · Approved

  • 50 Dundonald St · Consent

    To obtain consent for the technical severance of the property to re-establish two residential lots which merged on title, and to create new easements/rights-of-way.

    110 m away · filed Jul 12, 2023 · Approved

  • 72 Wellesley St E · Minor variance

    To alter the existing mixed-use building by installing a take-out eating establishment (retail bakery) within an existing unit on the ground level.

    60 m away · filed Nov 14, 2022 · Approved

  • 506 Church St · Consent

    To create a 1m wide easement along the southern boundary of the subject site.

    220 m away · filed Oct 1, 2022 · Approved

  • 600 Church St · Minor variance

    Proposal to use the existing 2 storey building as mixed use (commercial/residential).

    200 m away · filed Dec 15, 2021 · Application withdrawn

  • 66 Gloucester St · Minor variance

    To alter the existing three-storey mixed use building by converting a portion of the basement into a dwelling unit.

    180 m away · filed Mar 13, 2020 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.