Toronto address · Ward 4, Parkdale-High Park
57 Callender St
The City of Toronto has 6 building permits since 2017 (6 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Two storey rear addition
Applied Aug 9, 2024 · issued Aug 19, 2024 · Permit 24 167750 HVA
- Permit issued
Small residential project · Party wall admin permits
Administrative party wall permit for work at 59 Callender St (24 146384)
Applied Jul 2, 2024 · issued Jul 8, 2024 · Permit 24 172785 BLD
- Inspections under way
Small residential project · Addition(s)
New two storey rear addition
Applied Jun 20, 2024 · issued Aug 6, 2024 · Permit 24 167750 BLD
- Inspections under way
Plumbing
Plumbing - Proposed underpinning (35 linear metres) and interior alteration sto first floor (70 m2), second floor (35 m2) and third floor (35 m2) to existing single family dwelling.See admin permit for 55,59 Callender st
Applied Mar 28, 2024 · issued Mar 28, 2024 · Permit 24 127438 PLB
- Inspections under way
Small residential project · Multiple projects
Proposed underpinning (35 linear metres) and interior alteration sto first floor (70 m2), second floor (35 m2) and third floor (35 m2) to existing single family dwelling.See admin permit for 55,59 Callender st
Applied Mar 19, 2024 · issued Mar 26, 2024 · Permit 24 127438 BLD
- Inspections under way
Drains and site services
Drain - Proposed underpinning (35 linear metres) and interior alteration sto first floor (70 m2), second floor (35 m2) and third floor (35 m2) to existing single family dwelling.
Applied Mar 19, 2024 · issued Mar 26, 2024 · Permit 24 127438 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear two-storey addition (at the northeast portion of the dwelling).
Decision: Approved (hearing May 15, 2024)
Filed Mar 18, 2024 · File A0289/24TEY
What’s planned nearby
Development sites within 500 m
- Approved
89-91 Beaty Avenue and 1497-1501 Queen Street West
7 storeys · 141 homes · Mixed use
260 m away · Rezoning · Approved · filed Feb 17, 2026
- Submitted
- Approved
6 storeys · 29 homes · Mixed use
400 m away · Site plan · Approved · filed Mar 24, 2021
- Under review
12 storeys · 249 homes · Mixed use
420 m away · Site plan · Under review · filed May 17, 2023
Neighbours’ Committee of Adjustment files within 250 m
5 Sorauren Ave · Minor variance
To construct a new two-storey ancillary building (containing two laneway suites), abutting the laneway, in the rear yard of the existing two-and-one-half-storey semi-detached residential apartment building. There will be two south side ground floor main entrances with stairs, and a second storey terrace. Also, there will be a total of nine residential dwelling units on this lot (seven units within the main building, and two units within the ancillary building).
190 m away · filed May 1, 2026 · Refused
104 Marion St · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing third storey dormers (east and west sides), a partial rear one-storey addition, and a rear ground floor deck with stairs.
190 m away · filed Nov 14, 2025 · Approved
5 Sorauren Ave · Minor variance
To construct a new two-storey ancillary building (containing two laneway suites with a basement walkout), in the rear yard of the existing two-and-one-half-storey semi-detached apartment building, abutting the side laneway. There will be a total of nine residential dwelling units on this lot (seven units within the main building and two units within the ancillary building).
190 m away · filed May 13, 2025 · Approved
93 Pearson Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey dormer addition, ground floor addition and basement addition. Also, to construct a new rear ground floor deck with stairs.
140 m away · filed May 7, 2025 · Approved
73 Sorauren Ave · Minor variance
To alter the existing three-storey detached dwelling (Fife House Foundation) by constructing two third storey dormers on the south side. Also, to construct a south side exterior platforms/staircase to access the second and third levels.
150 m away · filed Apr 28, 2025 · Approved
122 Marion St · Minor variance
To convert the existing two-storey, two-unit detached dwelling with a secondary suite in the basement, into a single-family dwelling, by constructing a rear and partial side two-storey addition with a rear ground floor deck, and a second storey balcony. The existing garage in the rear yard will be maintained and unaltered.
250 m away · filed Jun 29, 2024 · Approved
5 Sorauren Ave · Minor variance
To convert the existing two-and-one-half-storey detached dwelling with 4 secondary units (a total of 5 dwelling units within the dwelling) into a seven-unit apartment building (detached house with 6 secondary units classified as an apartment building). No long-term or short-term bicycle parking spaces will be provided on the site.
190 m away · filed Jun 20, 2024 · Approved
43 Callender St · Minor variance
To convert the two-and-one-half-storey semi-detached dwelling with two residential dwelling units into four residential dwelling units (fourplex) by constructing a rear three-storey addition with a rear three-storey deck. Also, to construct a new ground floor front porch, a front basement walkout, and side (north) exterior access stairs (providing access to the second and third storeys). The existing ancillary building (detached garage) abutting the laneway, in the rear yard, will be demolished.
50 m away · filed May 6, 2024 · Deferred
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.