Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

57 Langside Ave

The City of Toronto has 7 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposed interior alterations for basement second unit with existing above grade side entrance

    Applied Jan 21, 2025 · issued Jan 27, 2025 · completed Jun 2, 2025 · Permit 25 106941 PLB

    Closed
  • Small residential project · Second suite (New)

    Proposed interior alterations for basement second unit with existing above grade side entrance

    Applied Jan 21, 2025 · issued Jan 27, 2025 · completed Jun 2, 2025 · 1 home added · Permit 25 106941 BLD

    Closed
  • Plumbing

    Plumbing - Proposed interior alterations for basement second unit with existing above grade side entrance

    Applied Dec 20, 2024 · completed Dec 23, 2024 · Permit 24 252487 PLB

    Cancelled
  • Small residential project · Second suite (New)

    Proposed interior alterations for basement second unit with existing above grade side entrance

    Applied Dec 20, 2024 · completed Dec 23, 2024 · 1 home added · Permit 24 252487 BLD

    Cancelled
  • Small residential project · Addition(s)

    Construct (1) storey rear addition to existing bungalow. Rear deck

    Applied Jun 14, 2012 · issued Jun 21, 2012 · completed Feb 6, 2025 · Permit 12 193023 BLD

    Closed
  • Plumbing

    Plumbing - Construct (1) storey rear addition to existing bungalow. New deck

    Applied Jun 14, 2012 · issued Jun 21, 2012 · completed Oct 15, 2024 · Permit 12 193023 PLB

    Closed
  • Heating and ventilation

    HVAC - Construct (1) storey rear addition to existing bungalow. Rear deck. Extend ductwork

    Applied Jun 14, 2012 · issued Jul 12, 2012 · completed Oct 15, 2024 · Permit 12 193023 HVA

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 59 Langside Ave · Minor variance

    To construct a second storey addition above the existing dwelling, a covered front porch, and a deck in the rear yard.

    20 m away · filed Aug 20, 2026 · Hearing scheduled

  • 194 Gary Dr · Minor variance

    To construct a new garden suite in the rear yard.

    140 m away · filed Feb 13, 2026 · Approved

  • 55 Lockerbie Ave · Minor variance

    To construct a partial second storey addition above the existing dwelling, a two-storey front addition, two new basement walk-outs, a new rear deck and a new front porch.

    190 m away · filed Aug 18, 2025 · Approved

  • 42 Deerhurst Ave · Minor variance

    To construct a two-storey rear addition, a second storey addition above the existing dwelling, a new front porch and a rear yard deck with a basement walk-out.

    110 m away · filed Nov 1, 2022 · Approved

  • 27 Portage Ave · Minor variance

    To construct a new detached dwelling with an attached garage.

    250 m away · filed Feb 8, 2022 · Approved

  • 7 Ranwood Dr · Minor variance

    To construct a second storey addition, two-storey rear and south side additions and a new rear deck.

    250 m away · filed Nov 29, 2021 · Approved

  • 29 Ranwood Dr · Minor variance

    To construct a new detached dwelling with an attached garage.

    150 m away · filed Oct 21, 2021 · Refused

  • 53 Langside Ave · Minor variance

    To construct a new detached garage in the rear yard.

    20 m away · filed Oct 7, 2021 · Approved

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.