Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 6, York Centre

57 Purdon Dr

The City of Toronto has 5 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposed interior alterations create a new secondary suite on the top floor of the existing single family dwelling to convert it to a 2-unit dwelling.

    Applied Feb 27, 2019 · issued Mar 4, 2019 · completed Apr 16, 2019 · Permit 19 117713 HVA

    Closed
  • Small residential project · Second suite (New)

    Proposed interior alterations create a new secondary suite on the top floor of the existing single family dwelling to convert it to a 2-unit dwelling.

    Applied Feb 21, 2019 · issued Mar 4, 2019 · 1 home added · Permit 19 117713 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposed interior alterations create a new secondary suite on the top floor of the existing single family dwelling to convert it to a 2-unit dwelling.

    Applied Feb 21, 2019 · issued Mar 4, 2019 · completed Apr 16, 2019 · Permit 19 117713 PLB

    Closed
  • Plumbing

    Plumbing - Proposed interior alterations to existing single family dwelling

    Applied Nov 9, 2018 · issued Nov 20, 2018 · Permit 18 254599 PLB

    Inspections under way
  • Small residential project · Interior alterations

    Proposed interior alterations to existing single family dwelling

    Applied Nov 9, 2018 · issued Nov 20, 2018 · Permit 18 254599 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 21 Terrydale Dr · Minor variance

    To construct a second floor above the garage.

    100 m away · filed Nov 19, 2021 · Approved

  • 79 Purdon Dr · Minor variance

    To enclose the existing covered rear porch, to construct a new deck and to widen the existing driveway.

    110 m away · filed Dec 20, 2017 · Approved

Everything planned in York Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.