574 Spadina Ave
The City of Toronto has 7 building permits since 2017 (6 still open) and 2 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Drains and site services
Drain - Three storey rear addition and alterations to construct 6 dwelling units (from 5 units)
Applied Feb 27, 2024 · issued Mar 5, 2024 · Permit 23 111752 DRN
- Permit issued
Heating and ventilation
HVAC - Three storey rear addition and alterations to construct 6 dwelling units (from 5 units)
Applied Feb 9, 2024 · issued Jul 9, 2024 · Permit 23 111752 HVA
- Permit issued
Plumbing
Plumbing - Three storey rear addition and alterations to construct 6 dwelling units (from 5 units)
Applied Feb 9, 2024 · issued Feb 20, 2024 · Permit 23 111752 PLB
- Inspections under way
Small residential project · Multiple projects
Three storey rear addition and alterations to construct 6 dwelling units (from 5 units)
Applied Feb 8, 2023 · issued Jun 27, 2023 · Permit 23 111752 BLD
- Revocation pending
Plumbing
Plumbing - Proposal to underpin the foundation, a new basement entrance at the rear, reconstruct the front porch slab, basement alterations, plumbing work with the installation of a sump pump and back water valve
Applied Nov 2, 2020 · issued Jan 29, 2021 · Permit 20 214051 PLB
- Inspections under way
Small residential project · Multiple projects
Proposal to underpin the foundation, a new basement entrance at the rear, reconstruct the front porch slab, basement alterations, plumbing work with the installation of a sump pump and back water valve
Applied Nov 2, 2020 · issued Jan 29, 2021 · Permit 20 214051 BLD
- Permit issued
Drains and site services
Drain - Proposal to underpin the foundation, a new basement entrance at the rear, reconstruct the front porch slab, basement alterations, plumbing work with the installation of a sump pump and back water valve
Applied Nov 2, 2020 · issued Jan 29, 2021 · Permit 20 214051 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To convert the existing two-and-one-half-storey, five-unit, apartment building into a three-storey, seven-unit, apartment building by constructing a front porch with a second storey balcony as well as a three-storey rear addition with decks on all levels, on the retained lot described in Consent Application B0083/21TEY.
Decision: Approved (hearing Jun 8, 2022)
Filed Aug 7, 2021 · File A1006/21TEY
- Closed
Minor variance · Other
To maintain the existing three-storey semi-detached dwelling on the retained lot described in consent application B0067/18TEY.
Decision: Withdrawn
Filed Jun 29, 2018 · File A0641/18TEY
What’s planned nearby
Development sites within 500 m
- Under review
9 storeys · 109 homes · Mixed use
210 m away · Site plan · Under review · filed Apr 20, 2022
- Approved
- Under review
Neighbours’ Committee of Adjustment files within 250 m
147 Major St · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a two-storey addition (including a basement level) to a portion of the rear south wall. Also, to construct a rear second storey addition (enclosing the balcony into habitable space), and a rear third storey addition with a balcony. The existing one-storey ancillary building (detached garage, in the rear yard, abutting the laneway) will be maintained and unaltered.
230 m away · filed Feb 4, 2026 · Approved
46 Russell St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear three-storey addition, rear and side (west) balconies on the second and third storeys, and a side (west) basement window well. There will be a total of two residential dwelling units on this lot (one unit occupying the basement and ground floor, and one unit occupying the second and third storeys).
130 m away · filed Aug 5, 2025 · Deferred
91 Willcocks St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front covered porch, a front three-storey addition, a rear ground floor deck, rear second and third storey terraces, and a rear third storey addition. There will be a total of two residential dwelling units (duplex) on this lot.
90 m away · filed Aug 6, 2024 · Approved
148 Robert St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a third storey addition.
200 m away · filed Jun 24, 2024 · Approved
25 Major St · Minor variance
To legalize and to maintain the construction of a basement dwelling unit with front basement walkout stairs, which was constructed without an authorized building permit.There are a total of three residential dwelling units on this lot.
250 m away · filed Dec 21, 2023 · Approved
96 Willcocks St · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a three-storey rear addition (with a basement) and a third storey rear balcony. There will be no parking space on-site.
140 m away · filed Apr 20, 2023 · Approved
98 Willcocks St · Minor variance
To construct a two-storey rear addition with a rear basement walk-out.
140 m away · filed Jul 30, 2022 · Approved
121 Major St · Minor variance
To alter the existing 2½-storey dwelling by constructing a third storey cantilevered addition, a third storey rear balcony and to replace the rear basement walkout stairs to accommodate the new secondary suite within the basement.
190 m away · filed Jan 14, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.