Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

58 Strathcona Ave

The City of Toronto has 2 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing · Fixtures/Roof Drains: SFD

    Permit to relocate existing toilet and sink on ground floor of existing SFD

    Applied May 26, 2011 · issued May 26, 2011 · Permit 11 203568 PSA

    Inspections under way
  • Plumbing · Fixtures/Roof Drains: SFD

    Plumbing stand alone permit - Permit to relocate Bathrub and toilet and add second sink in existing second floor bathroom. And relocate kitchen sink on ground floor.

    Applied May 24, 2011 · issued May 24, 2011 · Permit 11 201247 PSA

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 654-668 Danforth Avenue

    49 storeys · 496 homes · Mixed use

    370 m away · Site plan · Under review · filed Aug 3, 2022

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 26 Strathcona Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition with a bay window (enclosing the terrace into habitable space).

    160 m away · filed Feb 18, 2026 · Approved

  • 29 Cavell Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition with a rear balcony (above the second level rooftop).

    150 m away · filed Jan 21, 2026 · Approved

  • 7 Strathcona Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition with a rear juliet balcony and front (north) dormer, a front three storey addition and a partial front one-storey addition (north-west side). Also, a front basement extension, front and rear second floor canopies, a front covered porch with stairs, and a rear ground floor covered deck with stairs. The existing rear one-storey ancillary building (detached garage, abutting the laneway) will be maintained and unaltered.

    220 m away · filed Oct 21, 2025 · Approved

  • 68 Wroxeter Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a complete third storey addition.

    90 m away · filed Sep 12, 2024 · Approved

  • 80 Wroxeter Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition, and a front third storey dormer.

    120 m away · filed Sep 20, 2023 · Approved

  • 23 Cavell Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a third storey addition with a rear balcony, a rear two-storey addition with a ground floor deck, a front second storey balcony and to reconstruct the front porch.

    180 m away · filed Dec 30, 2022 · Approved

  • 42 Dingwall Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition.

    250 m away · filed Dec 1, 2022 · Approved

  • 55 Wroxeter Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear second storey addition and to permit a front yard parking space.

    130 m away · filed Mar 19, 2022 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.