Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 11, University-Rosedale

581 Bathurst St

The City of Toronto has 7 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Underpinning

    Applied May 3, 2024 · issued May 30, 2024 · completed Dec 19, 2024 · Permit 23 117439 PLB (revision 01)

    Closed
  • Small residential project · Underpinning

    REVISION 01: ALTERATIONS TO INTERIOR LAYOUT OF BASEMENTUnderpinning

    Applied Apr 25, 2024 · issued Apr 30, 2024 · completed Jan 15, 2025 · Permit 23 117439 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - interior alterations secondary suite

    Applied Sep 14, 2023 · completed Feb 5, 2024 · Permit 23 202306 HVA

    Cancelled
  • Small residential project · Interior alterations

    interior alterations secondary suite

    Applied Sep 14, 2023 · completed Feb 5, 2024 · 1 home added · Permit 23 202306 BLD

    Cancelled
  • Drains and site services

    Drain - Underpinning

    Applied Mar 23, 2023 · issued Mar 23, 2023 · completed Jan 10, 2024 · Permit 23 117439 DRN

    Closed
  • Plumbing

    Plumbing - Underpinning

    Applied Mar 23, 2023 · issued Mar 23, 2023 · completed Dec 19, 2024 · Permit 23 117439 PLB

    Closed
  • Small residential project · Underpinning

    Underpinning

    Applied Feb 24, 2023 · issued Mar 23, 2023 · completed Jan 15, 2025 · Permit 23 117439 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 452 Bathurst Street

    6 storeys · 49 homes · Mixed use

    390 m away · Site plan · Under review · filed Oct 15, 2021

    Under review
  • 333 College Street

    20 storeys · Residential

    490 m away · Site plan · Approved · filed Dec 23, 2025

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 6 Croft St · Minor variance

    250 m away · filed Aug 25, 2026 · Postponed

  • 390 Markham St · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear one-storey sunroom addition. The existing rear one-storey partial addition will be demolished.

    150 m away · filed Aug 17, 2026 · Hearing scheduled

  • 48 Borden St · Minor variance

    To construct a new three-storey detached ancillary building containing one laneway suite (occupying the second and third levels) and a two-car garage (occupying the first level), abutting the laneway. The second and third storeys will be cantilevered at the side (northeast) portion of the building, and there will be a covered side (east) second storey balcony and a side (west) third storey terrace. The existing rear ancillary building (detached garage) will be demolished. There will be a total of two residential dwelling units on this lot (one unit within the main house, and one unit within t…

    200 m away · filed Jun 25, 2026 · Deferred

  • 116 Borden St · Minor variance

    To construct a new three-storey detached dwelling with a front covered porch with stairs, a rear basement walkout, a rear covered ground floor deck with stairs, a rear second storey balcony, and front and rear third storey dormers.

    180 m away · filed Jun 17, 2026 · Approved

  • 202 Lippincott St · Minor variance

    To alter the existing three-storey mixed-used semi-detached building by constructing a rear second storey rooftop deck with a rear exterior staircase, a rear basement walkout, and a rear ground floor patio. Also, to construct a new rear two-storey detached ancillary building (to contain one laneway suite with a basement level and a rooftop deck with rear stairs), abutting Antonio Fernandes Lane and Ulster Street. There will be a total of one commercial unit (laundromat within the main mixed-use building) and six residential dwelling units on this lot (five units within the main mixed-use buil…

    130 m away · filed May 4, 2026 · Approved

  • 338 Markham St · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, a rear ground floor deck, and a rear second storey deck. There will be a total of two residential dwelling units within this dwelling (one primary unit and one secondary suite within the rear portion of the second and third storeys of the dwelling).

    190 m away · filed Jan 8, 2026 · Postponed

  • 366 Palmerston Blvd · Minor variance

    To construct a new two-and-one-and-half-storey detached dwelling with a covered front porch with stairs, a front two-storey bay window, a front second storey terrace, a rear ground floor covered (canopy) deck, and a parking space on the side (south) of the lot. Also, to construct a new one-storey detached ancillary building (one-car garage), in the rear yard, abutting the side (south) of the lot and the rear laneway.

    250 m away · filed Nov 19, 2025 · Approved

  • 81 Lippincott St · Minor variance

    To alter the existing two-storey townhouse by constructing a rear two-storey addition and a rear ground floor deck with stairs. Also, interior alterations to construct a new dwelling unit in the basement of the townhouse. There will be a total of two dwelling units on this lot (one dwelling unit occupying the first and second storeys, and one dwelling unit occupying the basement level).

    240 m away · filed Oct 14, 2025 · Approved

Everything planned in University-Rosedale

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.