Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

582 Parliament St

The City of Toronto has 4 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    To complete interior alterations to open a take-out restaurant containing no seats.

    Applied May 22, 2014 · issued Jul 24, 2014 · completed May 25, 2026 · Permit 14 160053 BLD

    Closed
  • Heating and ventilation

    HVAC - To complete interior alterations to open a take-out restaraurant containing 3 seats.

    Applied May 22, 2014 · issued Jul 24, 2014 · completed May 25, 2026 · Permit 14 160053 HVA

    Closed
  • Plumbing

    Plumbing - To complete interior alterations to open a take-out restaraurant containing 3 seats.

    Applied May 22, 2014 · issued Jul 24, 2014 · completed May 25, 2026 · Permit 14 160053 PLB

    Closed
  • Addition or alteration · Addition(s)

    Construct addition at front

    Applied Apr 15, 2005 · issued May 24, 2005 · Permit 05 123691 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 603 1/2 Parliament St · Minor variance

    To legalize and to maintain the existing three-storey non-residential building, which was converted from a residential building, without an authorized building permit. The existing non-residential use (law office) will be maintained.

    40 m away · filed Jul 18, 2024 · Approved

  • 51 Metcalfe St · Minor variance

    To alter the existing three-storey semi-detached dwelling by constructing a new front porch (to replace the existing front porch).

    250 m away · filed Dec 6, 2023 · Approved

  • 37 Winchester St · Consent

    To sever the existing lot into two lots and to create a new easement.

    250 m away · filed May 11, 2023 · Approved

  • 41 Rose Ave · Consent

    To obtain consent for a technical severance to re-establish two residential lots which merged on title.

    80 m away · filed Dec 22, 2022 · Approved

  • 340 Wellesley St E · Minor variance

    To alter the existing three-storey townhouse dwelling by constructing a two-storey rear addition, a rear ground floor deck, a rear stepped window well, and a front basement walkout.

    200 m away · filed Nov 21, 2022 · Approved

  • 35 Amelia St · Minor variance

    To construct a two-storey ancillary building (laneway suite) in the rear yard of the property, abutting the laneway (Prohibition Lane).

    200 m away · filed Aug 28, 2022 · Approved

  • 7 Rose Ave · Minor variance

    To construct a one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.

    210 m away · filed May 19, 2022 · Approved

  • 66 Amelia St · Minor variance

    To alter the existing three-storey building by constructing a third storey roof top deck. Also, to construct a two-storey detached ancillary building (one-car garage and laneway suite) in the rear yard of the property, abutting the laneway.

    230 m away · filed Mar 1, 2022 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.