Toronto address · Ward 24, Scarborough-Guildwood
59 Copping Rd
The City of Toronto has 11 building permits since 2017 (8 still open) and 2 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Plumbing
Revision 01 - Revision 01- extend basement and ground floor by 3.10 to south, add second floor above ground floor, and construct two wood decksPlumbing - Construct a new basement and ground floor rear addition, a second storey sunroom, a covered deck, and a new two-car garage in the rear.
Applied Jun 25, 2025 · issued Jun 27, 2025 · Permit 22 130743 PLB (revision 01)
- Revision issued
Heating and ventilation
Revision 01 - extend basement and ground floor by 3.10 to south, add second floor above ground floor, and construct two wood decksHVAC - Construct a new basement and ground floor rear addition, a second storey sunroom, a covered deck, and a new two-car garage in the rear.
Applied Jun 25, 2025 · issued Aug 27, 2025 · Permit 22 130743 HVA (revision 01)
- Revision issued
Small residential project · Multiple projects
Revision 01- extend basement and ground floor by 3.10 to south, add second floor above ground floor, and construct two wood decksConstruct a new basement and ground floor rear addition, a second storey sunroom, a covered deck, and a new two-car garage in the rear.
Applied Jun 25, 2025 · issued Oct 22, 2025 · Permit 22 130743 BLD (revision 01)
- Cancelled
Small residential project · Multiple projects
Proposal to extend basement and ground floor by 3.10m to south, add second floor above ground floor, build two wood decks.
Applied Mar 3, 2025 · completed Jun 26, 2025 · Permit 25 124113 BLD
- Cancelled
Heating and ventilation
HVAC - Proposal to extend basement and ground floor by 3.10m to south, add second floor above ground floor, build two wood decks.
Applied Mar 3, 2025 · completed Jun 26, 2025 · Permit 25 124113 HVA
- Cancelled
Plumbing
Plumbing - Proposal to extend basement and ground floor by 3.10m to south, add second floor above ground floor, build two wood decks.
Applied Mar 3, 2025 · completed Jun 26, 2025 · Permit 25 124113 PLB
- Inspections under way
Heating and ventilation
HVAC - Construct a new basement and ground floor rear addition, a second storey sunroom, a covered deck, and a new two-car garage in the rear.
Applied Jun 7, 2022 · issued Sep 27, 2022 · Permit 22 130743 HVA
- Inspections under way
Plumbing
Revision 01 - Revision 01- extend basement and ground floor by 3.10 to south, add second floor above ground floor, and construct two wood decksPlumbing - Construct a new basement and ground floor rear addition, a second storey sunroom, a covered deck, and a new two-car garage in the rear.
Applied Apr 12, 2022 · issued Sep 26, 2022 · Permit 22 130743 PLB
- Inspections under way
Small residential project · Multiple projects
Construct a new basement and ground floor rear addition, a second storey sunroom, a covered deck, and a new two-car garage in the rear.
Applied Apr 5, 2022 · issued Sep 26, 2022 · Permit 22 130743 BLD
- Revision issued
Small residential project · Multiple projects
Second Storey Balcony.
Applied Jan 26, 2011 · issued Nov 4, 2016 · Permit 10 285322 BLD (revision 01)
- Inspections under way
Small residential project · Multiple projects
Second Storey Addition and interior alterations on ground floor, including HVAC and Plumbing
Applied Oct 26, 2010 · issued Dec 16, 2010 · Permit 10 285322 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a second-storey addition to the existing two-storey detached dwelling.
Decision: Approved (hearing May 1, 2024)
Filed Mar 6, 2024 · File A0055/24SC
- Closed
Minor variance · R addition
To construct a new basement and ground floor rear addition, a second storey sunroom, a covered deck, and a new two-car garage in the rear.
Decision: Approved (hearing Sep 22, 2021)
Filed Feb 25, 2021 · File A0081/21SC
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
None on file since 2017.
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.