Toronto address · Ward 22, Scarborough-Agincourt
59 Fairglen Ave
The City of Toronto has 3 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Plumbing
Plumbing - PROPOSED BASEMENT SECOND UNIT & WALKOUT BASEMENT
Applied Sep 6, 2022 · issued Dec 8, 2022 · Permit 22 200024 PLB
- Inspections under way
Drains and site services
Drain - PROPOSED BASEMENT SECOND UNIT & WALKOUT BASEMENT
Applied Sep 6, 2022 · issued Dec 8, 2022 · Permit 22 200024 DRN
- Inspections under way
Small residential project · Other
Proposed basement second unit & walkout basement
Applied Sep 6, 2022 · issued Dec 8, 2022 · 1 home added · Permit 22 200024 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
2771-2773 Victoria Park Avenue
4 storeys · 62 homes · Residential
270 m away · Site plan · Approved · filed Dec 19, 2024
- Under appeal
2912-2926 Sheppard Avenue East
50 storeys · 590 homes · Mixed use
460 m away · Rezoning · Under appeal · filed Apr 22, 2025
- Under review
2002 Pharmacy Avenue and 2992 Sheppard Avenue East
158 homes · Residential
470 m away · Condominium · Under review · filed Jul 9, 2026
Neighbours’ Committee of Adjustment files within 250 m
38 Fairglen Ave · Consent
To obtain consent for a technical severance to separate the property into back two lots, as the lots merged on title.
170 m away · filed Jan 30, 2026 · Approved
92 Fairglen Ave · Minor variance
MV for Lot Size New Build
170 m away · filed Jul 24, 2023 · Application withdrawn
92 Fairglen Ave · Minor variance
MV for Lot Size New Build
170 m away · filed Jul 24, 2023 · Application withdrawn
92 Fairglen Ave · Consent
Consent to sever Lot with Associated MV's
170 m away · filed Jul 24, 2023 · Application withdrawn
99 Fairglen Ave · Consent
To obtain consent to sever the property into two residential lots.
210 m away · filed Jul 27, 2021 · Refused
99 Fairglen Ave · Minor variance
To construct a new detached dwelling.
210 m away · filed Jul 27, 2021 · Refused
99 Fairglen Ave · Minor variance
To construct a new detached dwelling.
210 m away · filed Jul 27, 2021 · Refused
40 Huntingwood Dr · Consent
To sever the property into two (2) residential lots for the development of detached dwellings on each lot. requiring variances to the existing Zoning By-law(s). The existing dwelling is to be demolished. The application is to also create a parcel of land for road widening purposes to be conveyed to the City of Toronto. Applications for Consent B0012/21SC, and Minor Variance A0074/21SC and A0076/21SC are to be considered jointly by the Committee of Adjustment.
160 m away · filed Feb 23, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.