Toronto address · Ward 13, Toronto Centre
59 Gloucester St
The City of Toronto has 6 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to convert attic space to livable space to an existing sfd-townhouse.
Applied May 28, 2019 · issued Jun 16, 2021 · completed Jun 18, 2021 · Permit 19 160841 HVA
- Closed
Plumbing
Plumbing - Proposal for interior alterations to convert attic space to livable space to an existing sfd-townhouse.
Applied May 28, 2019 · issued Jun 16, 2021 · completed Jun 18, 2021 · Permit 19 160841 PLB
- Closed
Small residential project · Interior alterations
Proposal for interior alterations to convert attic space to livable space to an existing sfd-townhouse.
Applied May 28, 2019 · issued Jun 16, 2021 · completed Feb 4, 2022 · Permit 19 160841 BLD
- Closed
Plumbing
Plumbing - Minor interior alterations to first and second floor.
Applied Aug 29, 2008 · issued Aug 29, 2008 · completed Jun 18, 2021 · Permit 08 198874 PLB
- Closed
Small residential project · Interior alterations
Minor interior alterations to first and second floor.
Applied Aug 29, 2008 · issued Aug 29, 2008 · completed Jun 18, 2021 · Permit 08 198874 BLD
- Closed
Plumbing · Fixtures/Roof Drains: SFD
Additional PLB fixtures to existing 2nd floor WC.
Applied Jun 6, 2008 · issued Jun 6, 2008 · completed Jun 18, 2021 · Permit 08 166970 PSA
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To alter a townhouse by legalizing and maintaining an as built attic conversion to liveable space.
Decision: Approved (hearing Sep 20, 2018)
Filed May 11, 2018 · File A0490/18TEY
What’s planned nearby
Development sites within 500 m
- Under review
75 storeys · 843 homes · Mixed use
110 m away · Rezoning · Under review · filed Mar 17, 2026
- Under review
12 storeys · 115 homes · Mixed use
110 m away · Condominium · Under review · filed Nov 7, 2021
- Approved
552-570 Church Street and 64-66 Wellesley Street East
36 storeys · 409 homes · Mixed use
130 m away · Rezoning · Approved · filed Feb 20, 2026
- Under review
552-570 Church Street and 64-66 Wellesley Street East
36 storeys · 409 homes · Mixed use
150 m away · Site plan · Under review · filed Sep 13, 2022
- Under appeal
69 storeys · 647 homes · Residential
160 m away · Rezoning · Under appeal · filed Jun 10, 2025
- Under review
69 storeys · 814 homes · Residential
170 m away · Rezoning · Under review · filed Jun 23, 2025
Neighbours’ Committee of Adjustment files within 250 m
577 Yonge St · Minor variance
To permit the following uses within the existing four-storey non-residential building: a nightclub use within the basement, eating establishment use on the ground level, retail store use on the second level, place of assembly use on the third level, and recreation use on the fourth level.
220 m away · filed Aug 23, 2024 · Approved
7 Gloucester St · Consent
To obtain consent to sever the property into two residential lots. The existing easements/rights-of-way will be maintained and unaltered. The existing 44-storey mixed-use building (also on the lot) will be maintained and unaltered. This building is under a condo ownership and requires a variance to the Zoning By-law as outlined in Minor Variance Application A0653/24TEY.
190 m away · filed Jul 23, 2024 · Approved
11 Gloucester St · Minor variance
To convert the existing two-and-one-half-storey townhouse into a mixed-use building.
180 m away · filed Jul 23, 2024 · Approved
593 Yonge St · Minor variance
To alter the development standards for the site (as approved under Site Specific Zoning By-law 778-2016(OMB)), for the existing 44-storey mixed-use building, by constructing mezzanine space. Also, to convert the existing two-and-one-half-storey townhouses (located at the northeast corner on this lot, municipally known as 7 and 9 Gloucester Street) into mixed-use buildings, and to increase the non-residential gross floor areas.
220 m away · filed Jul 23, 2024 · Approved
55 Charles St E · Consent
To obtain consent to sever a lot (with a 50-storey residential building currently under construction) into 4 lots to separate the 100 freehold rental replacement units (located on levels 3 to 7), for ownership purposes. Also, to create easements/rights-of-way above and below-grade. There are no associated minor variance applications.
230 m away · filed Aug 31, 2023 · Approved
50 Dundonald St · Consent
To obtain consent for the technical severance of the property to re-establish two residential lots which merged on title, and to create new easements/rights-of-way.
40 m away · filed Jul 12, 2023 · Approved
2 Gloucester St · Minor variance
To alter the existing one-storey rooftop structure of Suite 406, by constructing a one-storey rooftop extension with a rooftop deck.
200 m away · filed Dec 9, 2022 · Approved
72 Wellesley St E · Minor variance
To alter the existing mixed-use building by installing a take-out eating establishment (retail bakery) within an existing unit on the ground level.
190 m away · filed Nov 14, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.