Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

59 Peard Rd

The City of Toronto has 3 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposed second floor addition, interior alterations and a covered rear verandah to the existing single family dwelling.

    Applied Oct 16, 2025 · issued Oct 27, 2025 · completed Jul 28, 2026 · Permit 25 110261 HVA

    Closed
  • Plumbing

    Plumbing - Proposed second floor addition, interior alterations and a covered rear verandah to the existing single family dwelling.

    Applied Jan 29, 2025 · issued Feb 28, 2025 · completed Jul 28, 2026 · Permit 25 110261 PLB

    Closed
  • Small residential project · Multiple projects

    Proposed second floor addition, interior alterations and a covered rear verandah to the existing single family dwelling.

    Applied Jan 29, 2025 · issued Feb 28, 2025 · completed Aug 5, 2026 · Permit 25 110261 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 77 Adair Rd · Minor variance

    To legalize and to maintain the existing covered front porch with stairs that was built beyond the limits of the authorized building permit (Permit No. 21 177213 BLD 01 SR).

    120 m away · filed May 4, 2026 · Approved

  • 45 Peard Rd · Minor variance

    To construct a new two-storey detached dwelling with an integral garage, a front covered porch with stairs, a rear covered ground floor deck with stairs, a rear basement walkout, a rear window well, and a rear second floor box bay window.

    70 m away · filed Dec 8, 2025 · Approved

  • 45 Peard Rd · Minor variance

    To construct a new two-storey detached dwelling with an integral garage, a front covered porch with stairs, a rear covered ground floor deck with stairs, a rear basement walkout, a rear window well, and a rear second floor box bay window.

    70 m away · filed Dec 8, 2025 · Approved

  • 8 Holmstead Ave · Consent

    To obtain consent to sever the property into two undersized residential lots and to maintain existing easements/rights-of-way.

    170 m away · filed Jun 19, 2025 · Approved

  • 8 Holmstead Ave · Minor variance

    To construct a new two-storey detached dwelling (duplex) with a front porch with stairs, a front integral garage, a rear basement walkout, a rear first storey deck with stairs. There will be a total of two residential dwelling units on this lot.

    170 m away · filed Feb 14, 2025 · Approved

  • 8 Holmstead Ave · Minor variance

    To construct a new two-storey detached dwelling (duplex) with a front porch with stairs, a front integral garage a rear basement walkout, and a rear first storey deck with stairs. There will be a total of two residential dwelling units on this lot.

    170 m away · filed Feb 14, 2025 · Approved

  • 59 Squires Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition with a rear covered balcony, and a secondary suite within the basement. Also, to construct a carport along the south side of the dwelling.

    230 m away · filed Feb 15, 2024 · Approved

  • 2949 St Clair Ave E · Minor variance

    To construct a new three-storey detached dwelling with an integrated garage and a rear second storey balcony.

    210 m away · filed Jan 4, 2023 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.