Toronto address · Ward 9, Davenport
592 Ossington Ave
The City of Toronto has 9 building permits since 2017 (9 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Underpinning and changes to approved permit 03-192162
Applied Apr 23, 2007 · issued Apr 23, 2007 · Permit 06 141572 HVA
- Revision issued
Small residential project · Garage
Revision to approved plans 06-141107
Applied Jul 14, 2006 · issued Jul 14, 2006 · Permit 06 141107 BLD (revision 01)
- Inspections under way
Small residential project · Multiple projects
Underpinning and changes to approved permit 03-192162
Applied Jun 1, 2006 · issued Jun 1, 2006 · Permit 06 141572 BLD
- Inspections under way
Small residential project · Garage
To construct a detached garage at the rear
Applied May 31, 2006 · issued May 31, 2006 · Permit 06 141107 BLD
- Inspections under way
Plumbing
DRAIN AND Plumbing Drain drawings included - Revision to add exterior foundation wall. Please refer to BP #03-192162. - Other(SR)
Applied Mar 10, 2006 · issued Mar 10, 2006 · Permit 04 185002 PLB
- Inspections under way
Small residential project · Other
Revision to add exterior foundation wall. Please refer to BP #03-192162.
Applied Oct 26, 2004 · issued Oct 26, 2004 · Permit 04 185002 BLD
- Inspections under way
Small residential project · Multiple projects
Revise approved building permit base on new OMB decision to build : 1- exterior stairs to rear 2nd floor deck 2- stairs walk-out from for basement
Applied Aug 3, 2004 · issued Aug 30, 2004 · Permit 03 192162 BLD (revision 01)
- Inspections under way
Small residential project · Multiple projects
Proposed construction in accordance with OMB decision; maintain sunroom addition at rear; reconstruct ground floor deck at rear; construct 2nd & 3rd floor decks at rear. Make interior alterations to basement for second unit.
Applied Nov 7, 2003 · issued Jun 18, 2004 · 1 home added · Permit 03 192162 BLD
- Inspections under way
Plumbing
Plumbing - Proposed construction in accordance with OMB decision; maintain sunroom addition at rear; reconstruct ground floor deck at rear; construct 2nd & 3rd floor decks at rear. Make interior alterations to basement for second unit. - Multiple Projects
Applied Nov 7, 2003 · issued Jun 18, 2004 · Permit 03 192162 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
Neighbours’ Committee of Adjustment files within 250 m
585 Shaw St · Minor variance
To alter the rear two-storey detached ancillary building (containing one dwelling unit with a cantilevered second storey at the south side, and east and west side canopies), by adding a second dwelling unit within this ancillary building. This ancillary building is currently under construction with an authorized building permit. There will be a total of six residential dwelling units on this lot (four units within the main semi-detached building, and two units within the ancillary building).
250 m away · filed May 20, 2026 · Approved
108 Concord Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a side (south) and rear two-storey addition and a third-storey side (south) and rear addition with a rear ground floor loggia and a carport in the front yard and third storey front dormer. Also, to construct a new one-storey detached ancillary building (shed) in the rear yard. The existing detached garage will be demolished.
130 m away · filed Nov 26, 2025 · Approved
483 Roxton Rd · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third storey addition, a rear three-storey addition (including a basement extension below) with a ground level deck with stairs and a rear third storey balcony, as well as a front partially covered porch with stairs. Also, to construct a rear two-storey detached ancillary building (abutting the laneway) containing a one-car garage and amenity space (on the second level). The existing one-storey detached ancillary building (garage) will be demolished.
250 m away · filed Aug 26, 2025 · Approved
324 Roxton Rd · Minor variance
To alter the existing two-storey semi-detached dwelling by reconstructing a front covered porch with stairs and a basement walkout, a rear ground floor covered deck, and a rear second floor deck. There will be three residential dwelling units on this lot.
240 m away · filed Apr 9, 2025 · Approved
456 Roxton Rd · Minor variance
To convert the existing two-and-one-half-storey semi-detached dwelling from two residential dwelling units into three residential dwelling units by constructing a rear two-storey addition, a rear third storey addition with a rear terrace, as well as front and rear basement walkouts. Also, to construct a two-storey ancillary building (containing one laneway suite), in the rear yard, abutting the laneway. There will be a total of 4 residential dwelling units on this lot.
170 m away · filed Apr 5, 2024 · Approved
513 Ossington Ave · Minor variance
To construct a new two-storey detached ancillary building (one laneway suite), in the rear yard, abutting the laneway. The existing fourplex dwelling will be maintained and unaltered.
250 m away · filed Mar 8, 2024 · Approved
170 Concord Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear ground floor addition and to enclose the existing front porch. The existing front porch stairs will be maintained and unaltered.
120 m away · filed Dec 12, 2023 · Approved
408 Roxton Rd · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front one-storey addition (porch enclosure).
110 m away · filed Jul 11, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.