Toronto address · Ward 9, Davenport
598 Brock Ave
The City of Toronto has 4 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Drains and site services
Drain - PROPOSAL FOR A PARTIAL DEMOLITION OF EXISTING LANEWAY GARAGE AND CONSTRUCTION OF A NEW 2-STOREY LANEWAY SUITE AT THE REAR OF THE EXISTING LOT. NO ALTERATIONS TO MAIN DWELLING.
Applied Apr 1, 2022 · issued Apr 13, 2022 · Permit 22 129683 DRN
- Closed
Heating and ventilation
Hvac - proposal for a partial demolition of existing laneway garage and construction of a new 2-storey laneway suite at the rear of the existing lot. No alterations to main dwelling.
Applied Apr 1, 2022 · issued Apr 13, 2022 · completed Sep 25, 2024 · Permit 22 129683 HVA
- Closed
Plumbing
Plumbing - PROPOSAL FOR A PARTIAL DEMOLITION OF EXISTING LANEWAY GARAGE AND CONSTRUCTION OF A NEW 2-STOREY LANEWAY SUITE AT THE REAR OF THE EXISTING LOT. NO ALTERATIONS TO MAIN DWELLING.
Applied Apr 1, 2022 · issued Apr 13, 2022 · completed Sep 25, 2024 · Permit 22 129683 PLB
- Closed
Small residential project · New laneway / rear yard suite
Proposal for a partial demolition of existing laneway garage and construction of a new 2-storey laneway suite at the rear of the existing lot. No alterations to main dwelling.
Applied Apr 1, 2022 · issued Apr 13, 2022 · completed Sep 25, 2024 · 1 home added · Permit 22 129683 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
1167-1175 Bloor Street West, 34-42 Brock Crescent and 90 Croatia Street
14 storeys · 52 homes · Mixed use
90 m away · Rezoning · Approved · filed Feb 9, 2026
- Under review
1141 Bloor Street West, 90 Croatia Street and 980 Dufferin Street
22 storeys · 264 homes · Mixed use
250 m away · Site plan · Under review · filed Feb 27, 2026
- Under review
510-514 Lansdowne Avenue and 1293-1301 Bloor Street West
28 storeys · Mixed use
330 m away · Site plan · Under review · filed Aug 9, 2022
- Under review
33 storeys · 634 homes · Mixed use
470 m away · Site plan · Under review · filed Aug 30, 2021
Neighbours’ Committee of Adjustment files within 250 m
1286 Bloor St W · Minor variance
To alter the existing three-storey mixed use building by constructing a rooftop mechanical penthouse with rooftop access and a rooftop access enclosure above the third storey with a partially covered rooftop terrace and a trellis. The ground floor and partial ground floor mezzanine level will contain a commercial unit (art gallery and event space). The second storey will contain a multi-function commercial space that supports StepStones for Youth's programming and the provides amenity space for building residents (counselling rooms, a gym, a break room, and an open-concept collaboration space…
230 m away · filed Sep 2, 2026 · Postponed
1141 Bloor St W · Consent
To obtain consent to sever portions of the land (above and below-grade strata) and to create new easements/rights-of-way.
240 m away · filed Oct 22, 2024 · Approved
1141 Bloor St W · Minor variance
To alter the development standards for Block A and Block B (containing Buildings A, B1, & B2, approved for 11, 34 and 37 storeys respectively) of the mixed-use redevelopment approved under Site Specific Zoning By-Law 700-2021 (OLT) by increasing the building height and number of dwelling units provided within mixed-use buildings A, B1 and B2. Also, to permit the reduction of parking spaces provided. There will be a total of 284 residential dwelling units within Block A and 859 residential dwelling units within Block B provided. This is currently under review by Site Plan Control Applications…
240 m away · filed May 16, 2024 · Approved
390 St Clarens Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition, a rear two-storey addition with a first storey deck and a third storey deck, and a front second storey deck. This dwelling will have two residential dwelling units (duplex) on this lot.
210 m away · filed Apr 10, 2024 · Approved
90 Croatia St · Minor variance
To alter the development standards for Blocks C, D, E and F, containing Buildings C, D, E and F of the mixed-use redevelopment approved under Site Specific Zoning By-Law 700-2021 (OLT) to permit increases to the gross floor area, increases to the permitted height, to add additional elements to the list of permitted setback encroachments, increases to specific height projections, increases to the percentage of grade for loading access ramps, limiting reduction of amenity space area from overall gross floor area, and relief from the size and location of the private school and private day nurser…
120 m away · filed Mar 7, 2024 · Approved
451 St Clarens Ave · Minor variance
To legalize and to maintain the rear second storey addition, which was constructed without an authorized building permit. Also, to alter the existing three-storey detached dwelling by constructing a rear third storey addition, a front second storey deck, a rear second storey cantilevered deck with a staircase, and a rear third storey deck.
170 m away · filed Oct 6, 2023 · Approved
90 Croatia St · Consent
To sever the existing lot into two seperate lots to facilitate construction of the existing development.
120 m away · filed Sep 27, 2023 · Application withdrawn
560 Brock Ave · Minor variance
To alter the existing two-and-one-half-storey townhouse by demolishing the existing one-storey rear portion of the dwelling, constructing a new two-storey rear addition, and a third storey rear roof deck. The existing ancillary building (one-storey garage abutting the laneway), in the rear yard, will be maintained and unaltered.
110 m away · filed Sep 12, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.