Toronto address · Ward 13, Toronto Centre
6 Adelaide St E
The City of Toronto has 22 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Heating and ventilation · Alter: Boiler/Furnace/AC replacement
Replacement of existing heating system with Air Source Heat Pumps and a back up condensing boiler. Mechanical room update to renew building pumps.
Applied Jun 12, 2026 · issued Jul 20, 2026 · Permit 26 183456 MSA
- Revision issued
Addition or alteration · Multiple projects
REV: The scope of changes is as follows-Typo error in specified design loads ¿ letter signed by engineer has been attached.Notes, markups and comments provided by City of Toronto Transportation Services and utility providers.Proposal to removal and rehabilitation of existing podium deck slab and corresponding surface finishes, installation of new structural steel beams and columns to support podium deck slab, and installation of new drainage board and weeping tile in select basement locations.
Applied Sep 30, 2025 · issued Nov 3, 2025 · Permit 25 163880 BLD (revision 01)
- Inspections under way
Addition or alteration · Multiple projects
Proposal to removal and rehabilitation of existing podium deck slab and corresponding surface finishes, installation of new structural steel beams and columns to support podium deck slab, and installation of new drainage board and weeping tile in select basement locations.
Applied May 23, 2025 · issued Jun 24, 2025 · Permit 25 163880 BLD
- Closed
Addition or alteration · Other
Targeted repair of deteriorated cast stone on the south and west elevations.
Applied Nov 25, 2024 · issued Jan 3, 2025 · completed Aug 27, 2026 · Permit 24 243059 BLD
- Closed
Addition or alteration · Interior alterations
Proposal for Interior alterations, including HVAC and PLB alterations of an existing office space.
Applied Nov 19, 2024 · issued Dec 11, 2024 · completed Feb 27, 2025 · Permit 24 240472 BLD
- Closed
Heating and ventilation
HVAC - Proposal for Interior alterations, including HVAC and PLB alterations of an existing office space.
Applied Nov 19, 2024 · issued Dec 20, 2024 · completed Feb 13, 2025 · Permit 24 240472 HVA
- Closed
Plumbing
Plumbing - Proposal for Interior alterations, including HVAC and PLB alterations of an existing office space.
Applied Nov 19, 2024 · issued Dec 20, 2024 · completed Feb 13, 2025 · Permit 24 240472 PLB
- Closed
Heating and ventilation
HVAC - Proposed Interior alteration/ renovation to existing office space, suite 200.
Applied Jun 17, 2024 · issued Aug 2, 2024 · completed Oct 17, 2024 · Permit 24 165862 HVA
- Closed
Addition or alteration · Interior alterations
Proposed Interior alteration/ renovation to existing office space, suite 200.
Applied Jun 17, 2024 · issued Aug 2, 2024 · completed Oct 9, 2024 · Permit 24 165862 BLD
- Closed
Plumbing
Plumbing - Proposed Interior alteration/ renovation to existing office space, suite 200.
Applied Jun 17, 2024 · issued Aug 2, 2024 · completed Oct 17, 2024 · Permit 24 165862 PLB
- Closed
Heating and ventilation · Other
Proposal for minor modifications of existing HVAC to add new transfer ducts for return air to suit new acoustic baffles in ceiling plenum and re-balancing in the existing office space.
Applied Jul 27, 2022 · issued Aug 25, 2022 · completed Jan 10, 2023 · Permit 22 182678 MSA
- Permit issued
Addition or alteration · Interior alterations
Proposal for interior alteration at an office.
Applied Jun 20, 2022 · issued Jul 5, 2022 · Permit 22 164942 BLD
Show 10 more permits
- Closed
Addition or alteration · Multiple projects
Proposal for interior & exterior alterations to replace the main entrance doors on the ground floor level.
Applied Aug 19, 2021 · issued Sep 8, 2021 · completed Aug 8, 2022 · Permit 21 201664 BLD
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to demolish retail unit 113 & bring it back to base building condition. [Other addresses associated with this lot: 111 / 113 / 115 Yonge St.]
Applied Oct 27, 2020 · issued Nov 10, 2020 · completed Jan 18, 2021 · Permit 20 211217 BLD
- Closed
Heating and ventilation
HVAC - Proposed Interior Alterations to demolition, back to base building. unit 113
Applied Oct 27, 2020 · issued Nov 10, 2020 · completed Feb 17, 2021 · Permit 20 211217 HVA
- Closed
Addition or alteration · Other
Proposed rooftop cooling tower steel frame replacement.
Applied Dec 10, 2019 · issued Jan 21, 2020 · completed Apr 7, 2021 · Permit 19 259361 BLD
- Closed
Addition or alteration · Interior alterations
Rev01: Add 3 meeting rooms to scope - 78m2Orig: Interior Alterations to office on the 6th floor Unit 600 to remove 2 meeting rooms to provide space for the additional workstations.
Applied May 23, 2018 · issued Jun 7, 2018 · completed Jun 6, 2019 · Permit 18 139047 BLD (revision 01)
- Closed
Heating and ventilation
Rev01: Add 3 meeting rooms to scope - 78m2Orig: HVAC - Interior Alterations to office on the 6th floor Unit 600 to remove 2 meeting rooms to provide space for the additional workstations.
Applied May 23, 2018 · issued Jun 20, 2018 · completed Jul 19, 2019 · Permit 18 139047 HVA (revision 01)
- Closed
Plumbing · Piping: other buildings
Proposal to replace 4" water main from city valve to fire protection header inside the office building.Part of fire line below ground (approx. 4 feet) from city valve to the basement wall. Convenience address is 6 Adelaide Street East.
Applied May 1, 2018 · issued May 24, 2018 · completed Sep 16, 2019 · Permit 18 151286 PSA
- Closed
Heating and ventilation
HVAC - Interior Alterations to office on the 6th floor Unit 600 to remove 2 meeting rooms to provide space for the additional workstations.
Applied Apr 5, 2018 · issued May 10, 2018 · completed Jul 19, 2019 · Permit 18 139047 HVA
- Closed
Addition or alteration · Interior alterations
Interior Alterations to office on the 6th floor Unit 600 to remove 2 meeting rooms to provide space for the additional workstations.
Applied Apr 5, 2018 · issued May 1, 2018 · completed Jun 6, 2019 · Permit 18 139047 BLD
- Closed
Plumbing · Backflow prevention devices (Water only)
install backflow preventer to basement of commercial/office building
Applied Apr 13, 2015 · issued Apr 22, 2015 · completed Aug 15, 2019 · Permit 15 139973 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
17-25 Toronto Street and 55-57 Adelaide Street East
80 storeys · 816 homes · Mixed use
150 m away · Site plan · Under review · filed Apr 26, 2023
- Under review
56 storeys · 394 homes · Mixed use
160 m away · Site plan · Under review · filed Aug 3, 2022
- Under review
1-3 King Street East and 69-71 Yonge Street
15 storeys · 127 homes · Residential
190 m away · Site plan · Under review · filed Nov 7, 2021
- Under review
63 storeys · 370 homes · Mixed use
200 m away · Rezoning · Under review · filed Nov 28, 2025
- Approved
114-120 Church Street and 59 Richmond Street East
48 storeys · 592 homes · Mixed use
250 m away · Condominium · Approved · filed Mar 4, 2025
- Under review
68 storeys · 836 homes · Residential
270 m away · Rezoning · Under review · filed Oct 21, 2024
Neighbours’ Committee of Adjustment files within 250 m
20 King St W · Minor variance
To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).
150 m away · filed May 6, 2026 · Approved
71 King St E · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 552-2019(LPAT)), for the existing four-storey commercial/office building, by permitting the dwelling unit use through the conversion of the second and third storeys from commercial/offices uses into residential dwelling units (live/work units). Also, to permit a new residential lobby, facing King Street East. No visitor parking spaces and accessible parking spaces will be provided on-site. There will be a total of three commercial units and 11 residential dwelling units (7 dwelling units and 1 commercial unit on…
250 m away · filed Aug 26, 2024 · Approved
34 King St E · Minor variance
To alter the development standards for the 33-storey mixed-use building (approved under Site Specific Zoning By-Law 1195-2022), by converting the required office use space into hotel use space (for 142 hotel suites and related facilities) on floors 1 through 10. The site is subject to a current Site Plan Control Application (File 2017 235087 STE 28 SA).
150 m away · filed Jul 8, 2024 · Approved
67 Adelaide St E · Minor variance
To construct a partial fourth floor addition to the existing building for the conversion into a Municipal Shelter.
240 m away · filed May 19, 2021 · Approved
20 Lombard St · Minor variance
To alter the redevelopment plan for a 46-storey mixed-use building, previously approved under Site-Specific By-laws 132-2016 (OMB) and 133-2016 (OMB), by creating additional dwelling units, converting residential parking spaces to commercial parking spaces and converting a bicycle parking area to a bulk parcel storage room.
160 m away · filed Sep 21, 2020 · Approved
25 Richmond St E · Minor variance
To alter the redevelopment plan for the 46 storey mixed-use building approved under Site-Specific By-Laws 132-2016 and 133-2016, by relocating amenity space from floor 45 to floor 46, constructing two additional dwelling units on floor 45 (total 693 Dwelling Units), and increasing the gross floor area accordingly. Additionally, this application seeks to maintain the existing fifth storey addition and elevator overrun located atop the southeastern heritage building.
170 m away · filed Oct 3, 2019 · Approved
65 King St E · Consent
To obtain consent to sever a portion of the land for the purpose of a lot addition and to create various easements/rights-of-way. This application is associated with consent applications B0036/18TEY, B0037/18TEY, B0039/18TEY and B0060/18TEY which collectively facilitate the creation of three stratified parcels for a commercial and office redevelopment scheme.
240 m away · filed Mar 29, 2018 · Approved
65 King St E · Consent
To obtain consent to sever the land for the purpose of lot additions to ultimately create three parcels of land and to create various easements/rights-of-way.
240 m away · filed Mar 29, 2018 · Withdrawn
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.