Toronto address · Ward 1, Etobicoke North
6 Atwood Pl
The City of Toronto has 16 building permits since 2017 (8 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Heating and ventilation
REV 01: Changes to layout HVAC - Proposed interior alterations to basement and main floor
Applied Mar 25, 2026 · issued Mar 31, 2026 · Permit 25 219495 HVA (revision 01)
- Revision issued
Small residential project · Interior alterations
Rev 02 - Window size changes on main floor and ex.door connecting main and basement to be removed in basement.Rev 01: changes with new secondary suite in basement, new designerProposed interior alterations to basement and main floor
Applied Feb 23, 2026 · issued Mar 19, 2026 · Permit 25 219495 BLD (revision 02)
- Revision issued
Small residential project · Interior alterations
Rev 01: changes with new secondary suite in basement, new designerProposed interior alterations to basement and main floor
Applied Nov 5, 2025 · issued Nov 13, 2025 · 1 home added · Permit 25 219495 BLD (revision 01)
- Revision issued
Plumbing
Rev 01: changes with new secondary suite in basement, new designerPlumbing - Proposed interior alterations to basement and main floor
Applied Nov 5, 2025 · issued Nov 12, 2025 · Permit 25 219495 PLB (revision 01)
- Inspections under way
Heating and ventilation
HVAC - Proposed interior alterations to basement and main floor
Applied Sep 3, 2025 · issued Sep 12, 2025 · Permit 25 219495 HVA
- Inspections under way
Plumbing
Plumbing - Proposed interior alterations to basement and main floor
Applied Sep 3, 2025 · issued Sep 9, 2025 · Permit 25 219495 PLB
- Permit issued
Drains and site services
Drain - Proposed interior alterations to basement and main floorBACKWATER VALVE INCLUDED
Applied Sep 3, 2025 · issued Sep 9, 2025 · Permit 25 219495 DRN
- Inspections under way
Small residential project · Interior alterations
Proposed interior alterations to basement and main floor
Applied Sep 3, 2025 · issued Sep 9, 2025 · Permit 25 219495 BLD
- Cancelled
Drains and site services
Drain - Proposed interior alterations to basement and main floorBACKWATER VALVE INCLUDED
Applied Jul 22, 2025 · completed Jul 24, 2025 · Permit 25 198019 DRN
- Cancelled
Heating and ventilation
HVAC - Proposed interior alterations to basement and main floor
Applied Jul 22, 2025 · completed Jul 24, 2025 · Permit 25 198019 HVA
- Cancelled
Plumbing
Plumbing - Proposed interior alterations to basement and main floor
Applied Jul 22, 2025 · completed Jul 24, 2025 · Permit 25 198019 PLB
- Cancelled
Small residential project · Interior alterations
Proposed interior alterations to basement and main floor
Applied Jul 22, 2025 · completed Jul 24, 2025 · Permit 25 198019 BLD
Show 4 more permits
- Cancelled
Heating and ventilation
HVAC - Proposal to construct interior alterations and remove existing chimney.
Applied Jul 15, 2025 · completed Jul 18, 2025 · Permit 25 193998 HVA
- Cancelled
Small residential project · Interior alterations
Proposal to construct interior alterations and remove existing chimney.
Applied Jul 15, 2025 · completed Jul 18, 2025 · Permit 25 193998 BLD
- Cancelled
Plumbing
Plumbing - Proposal to construct interior alterations and remove existing chimney.
Applied Jul 15, 2025 · completed Jul 18, 2025 · Permit 25 193998 PLB
- Cancelled
Drains and site services
Drain - Proposal to construct interior alterations and remove existing chimney.
Applied Jul 15, 2025 · completed Jul 18, 2025 · Permit 25 193998 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
None on file since 2017.
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.