Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

6 Edgewood Gdns

The City of Toronto has 8 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    REVISION - to add washroom windows and enlarge a bedroom windowALTERING INTERIOR, ADDING A WALK UP, AND MOVING BATHROOM FIXTURE LOCATION.CREATING SECONDARY UNIT IN BASEMENT.

    Applied Jun 17, 2024 · issued Jul 8, 2024 · Permit 23 216815 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    Hvac - altering interior, adding a walk up, and moving bathroom fixture location.creating secondary unit in basement.

    Applied Jan 15, 2024 · issued Feb 13, 2024 · Permit 23 216815 HVA

    Inspections under way
  • Small residential project · Multiple projects

    Altering interior, adding a walk up, and moving bathroom fixture location.creating secondary unit in basement.

    Applied Oct 20, 2023 · issued Feb 23, 2024 · Permit 23 216815 BLD

    Inspections under way
  • Drains and site services

    Drain - ALTERING INTERIOR, ADDING A WALK UP, AND MOVING BATHROOM FIXTURE LOCATION.CREATING SECONDARY UNIT IN BASEMENT.

    Applied Oct 20, 2023 · issued Feb 13, 2024 · Permit 23 216815 DRN

    Inspections under way
  • Plumbing

    Plumbing - ALTERING INTERIOR, ADDING A WALK UP, AND MOVING BATHROOM FIXTURE LOCATION.CREATING SECONDARY UNIT IN BASEMENT.

    Applied Oct 20, 2023 · issued Feb 13, 2024 · Permit 23 216815 PLB

    Inspections under way
  • Plumbing

    Plumbing - ALTERING INTERIOR, ADDING A WALK UP, AND MOVING BATHROOM FIXTURE LOCATION.CREATING SECONDARY UNIT IN BASEMENT.

    Applied Sep 29, 2023 · completed Oct 5, 2023 · Permit 23 208874 PLB

    Cancelled
  • Small residential project · Interior alterations

    Altering interior, adding a walk up, and moving bathroom fixture location.creating secondary unit in basement.

    Applied Sep 29, 2023 · completed Oct 5, 2023 · 1 home added · Permit 23 208874 BLD

    Cancelled
  • Drains and site services

    Drain - ALTERING INTERIOR, ADDING A WALK UP, AND MOVING BATHROOM FIXTURE LOCATION.CREATING SECONDARY UNIT IN BASEMENT.

    Applied Sep 29, 2023 · completed Oct 5, 2023 · Permit 23 208874 DRN

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 4 Newbold Avenue

    10 storeys · 70 homes · Residential

    390 m away · Rezoning · Under review · filed Apr 16, 2025

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 5 Edgewood Gdns · Minor variance

    To legalize and to maintain one additional ground floor deck, two ancillary buildings (sheds containing storage, utility, and garden equipment), and hard surface driveway and patio areas, which have been constructed without an authorized building permit. Also, to permit the existing two-storey detached ancillary building (containing one garden suite). There is a total of two residential dwelling units on this lot (one unit occupying the main dwelling, and one unit occupying the ancillary building.

    30 m away · filed Nov 13, 2025 · Approved

  • 8 Edgewood Grv · Minor variance

    To construct a new two-storey detached dwelling (including a basement) with a front ground level covered deck (abutting Edgewood Grove), and a side (east) covered porch with stairs (abutting Edgewood Gardens). Also, to construct a new one-storey detached ancillary building (one-car garage), abutting Edgewood Gardens.

    30 m away · filed Nov 4, 2025 · Approved

  • 66 Edgewood Ave · Minor variance

    To construct a new two-storey garden suite with a front basement walkout, a front ground floor entrance with external stairs, and north and south side second storey green roofs, in the rear yard of the lot. The existing two-storey detached main dwelling on the lot will remain unaltered.

    200 m away · filed Jan 20, 2024 · Approved

  • 63 Wrenson Rd · Minor variance

    To install a front yard parking pad.

    160 m away · filed Dec 19, 2023 · Deferred

  • 182 Eastwood Rd · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a one-storey rear addition, and a rear deck with stairs.

    200 m away · filed Jan 12, 2023 · Approved

  • 1 Edgewood Gdns · Minor variance

    To alter the existing one-and-one-half-storey detached dwelling by constructing a complete second storey addition, a two-storey front addition, and a front second storey cantilevered window box.

    40 m away · filed Nov 4, 2022 · Approved

  • 76 Eastwood Rd · Minor variance

    To construct a new three-storey four-unit dwelling with a rear basement walkout, front and rear basement level patios, a rear ground floor terrace, a side (west) ground floor entrance platform, a covered front porch, second storey front and rear balconies, and third storey front and rear terraces. Also, to construct a rear two-storey ancillary building (garden suite) with a first storey rear patio and rear second storey juliette balcony.

    160 m away · filed Oct 24, 2022 · Approved

  • 44 Highcroft Rd · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a one-storey rear sunroom addition with a new deck.

    230 m away · filed May 24, 2022 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.