Toronto address · Ward 5, York South-Weston
6 Lambton Ave
Fire Station 421
The City of Toronto has 6 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Addition or alteration · Multiple projects
Rev 01 - Removal of exterior back door from scope of work, widening of 2 new doors, relocation of power door operators, removal of electrical works for exterior back door from scope of work.Proposal for complete accessibility upgrades.
Applied Apr 28, 2022 · issued Sep 27, 2024 · completed Jan 16, 2025 · Permit 21 104009 BLD (revision 01)
- Closed
Addition or alteration · Multiple projects
Proposal for complete accessibility upgrades.
Applied Jan 13, 2021 · issued Feb 1, 2021 · completed Jan 16, 2025 · Permit 21 104009 BLD
- Closed
Heating and ventilation
HVAC - Proposal for complete accessibility upgrades.
Applied Jan 13, 2021 · issued Feb 1, 2021 · completed Apr 29, 2026 · Permit 21 104009 HVA
- Closed
Plumbing
Plumbing - Proposal for complete accessibility upgrades.
Applied Jan 13, 2021 · issued Feb 1, 2021 · completed Jan 9, 2025 · Permit 21 104009 PLB
- Closed
Addition or alteration · Other
Revision #01 - Proposal to change the location of generator to grade on a concrete pad.Proposal to install a pad mounted natural gas standby generator on the rooftop of existing fire hall - Fire Station #421
Applied Apr 27, 2020 · issued May 28, 2020 · completed Apr 12, 2021 · Permit 19 170309 BLD (revision 01)
- Closed
Addition or alteration · Interior alterations
Proposal to install a pad mounted natural gas standby generator on the rooftop of existing fire hall - Fire Station #421
Applied Jun 12, 2019 · issued Jul 18, 2019 · completed Apr 12, 2021 · Permit 19 170309 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
43 storeys · Residential
180 m away · Rezoning · Under review · filed Sep 8, 2025
- Under review
24 storeys · Not stated in the file
200 m away · Site plan · Under review · filed Oct 21, 2021
- Under review
49 storeys · 2,356 homes · Mixed use
290 m away · Subdivision · Under review · filed Jul 19, 2021
- Approved
Neighbours’ Committee of Adjustment files within 250 m
59 Brownville Ave · Minor variance
To construct a rear two-storey addition, a front basement walkout, stairs along the east side of the dwelling, and a new front porch. The existing dwelling will be converted into a triplex.
170 m away · filed Oct 17, 2025 · Approved
20 Lambton Ave · Minor variance
To construct a third storey addition above the existing dwelling and a three-storey rear addition.
60 m away · filed Jan 2, 2024 · Approved
30 Lambton Ave · Minor variance
To permit two secondary suites.
110 m away · filed Jan 30, 2023 · Approved
27 Brownville Ave · Minor variance
To legalize and to maintain the existing detached dwelling with a detached garage currently under construction.
200 m away · filed Jun 13, 2022 · Approved
82 Brownville Ave · Minor variance
To construct a rear two-storey addition and a new rear deck.
160 m away · filed Aug 25, 2021 · Approved
30 Lambton Ave · Minor variance
To construct a new detached dwelling.
110 m away · filed Mar 24, 2021 · Approved
17 Dennis Ave · Minor variance
To construct a new three-storey elementary school.
160 m away · filed Mar 5, 2021 · Approved
39 Lambton Ave · Minor variance
To construct a new dwelling with a secondary suite and to maintain the existing detached garage and shed.
90 m away · filed Sep 21, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.