Toronto address · Ward 19, Beaches-East York
6 Park Vista
The City of Toronto has 8 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Designated structure · Sign building permit related
1 Ground Sign
Applied Sep 2, 2025 · issued Sep 15, 2025 · completed Dec 15, 2025 · Permit 25 219056 DST
- Cancelled
Designated structure · Sign building permit related
1 Ground Sign
Applied Jul 11, 2025 · completed Jul 16, 2025 · Permit 25 192263 DST
- Closed
Heating and ventilation
HVAC - Replace existing life-safety genertor. Construct new partition to separate the room from the rest of the mechanical room. Construct wall openings for combustion and ventilation air. Provide toxic gas monitor and fan. Add four new spinkler heads.
Applied Apr 4, 2023 · issued May 8, 2023 · completed Sep 19, 2024 · Permit 23 130800 HVA
- Closed
Addition or alteration · Multiple projects
Replace existing life-safety genertor. Construct new partition to separate the room from the rest of the mechanical room. Construct wall openings for combustion and ventilation air. Provide toxic gas monitor and fan. Add four new spinkler heads.
Applied Apr 4, 2023 · issued May 8, 2023 · completed Oct 7, 2024 · Permit 23 130800 BLD
- Cancelled
Addition or alteration · Garage Repair/Reconstruction
Localized parking garage repairs
Applied Aug 11, 2015 · completed Jan 16, 2017 · Permit 15 205154 BLD
- Closed
Plumbing · Backflow prevention devices (Water only)
Install (1) backflow preventer premise isolation
Applied Apr 26, 2015 · issued May 25, 2015 · completed Aug 14, 2018 · Permit 15 146892 PSA
- Closed
Addition or alteration · Balcony/Guard repairs
Proposal for balcony repairs and railing replacement including minor cladding repairs for existing residential apartment building.
Applied Jun 4, 2013 · issued Jul 3, 2013 · completed Sep 4, 2024 · Permit 13 180811 BLD
- Closed
Addition or alteration · Other
Proposal for repairs to retaining wall on north side of building (75 linear meters).
Applied Nov 12, 2012 · issued Apr 2, 2013 · completed Sep 11, 2024 · Permit 12 277333 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Deferred
Minor variance · Other
To alter the existing 10-storey apartment building by converting the second floor laundry room, the third floor storage room and locker rooms on the fourth through ninth floors (all located on the south side of the building) into eight residential dwelling units. Also, to convert the ground floor storage and mechanical room (located on the south side of the building) into a laundry room with amenity space (meeting room/lounge) and a maintenance area. Also, the southeast portion of the ground floor lobby will be converted into an additional amenity space (meeting room/lounge). There will be fi…
Decision: Deferred
Filed Feb 17, 2026 · File A0124/26TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
7 Park Vista · Minor variance
To alter the existing 8-storey residential apartment building by converting the laundry and storage rooms (located on the second, third, fifth, sixth, seventh, and eighth levels) into 2 bachelor units and 4 one-bedroom units (for a total of 6 new residential dwelling units). There will be a total of 91 residential dwelling units on this lot.
50 m away · filed Jul 15, 2025 · Approved
2 Park Vista · Minor variance
To alter the existing 11-storey residential apartment building by converting the second floor laundry room as well as the locker rooms on the fourth to tenth storeys into eight bachelor units. The existing storage rooms on the ground floor will be converted into laundry room and locker rooms. There will be a total of 129 residential dwelling units on this lot.
180 m away · filed Apr 2, 2025 · Approved
349 Dawes Rd · Minor variance
To alter the existing one-and-one-half-storey detached dwelling by constructing a second storey addition, a rear one-storey addition, a new side staircase and landing, and a new covered front porch.
220 m away · filed Jan 18, 2023 · Approved
80 Halsey Ave · Minor variance
To alter the existing two-storey townhouse dwelling by converting the garage space into a secondary suite (located in the basement and on the ground floor). Also, the existing driveway will be used for one parking space.
150 m away · filed Apr 29, 2022 · Approved
7 Park Vista · Minor variance
To alter the existing seven-storey, 84-unit apartment building by converting the fourth storey storage room into a one-bedroom unit.
50 m away · filed Aug 3, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.