Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

6 Trinity Sq

Church Of The Holy Trinity

The City of Toronto has 2 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Fire and security upgrade · Fire alarm

    Proposal to replace the existing fire alarm panel and add remote trouble indicator.

    Applied Jun 17, 2022 · issued Jun 20, 2022 · Permit 22 164041 FSU

    Inspections under way
  • Designated structure · Sign building permit related

    In conjunction with a church located on the premises, proposal to erect and display two illuminated ground signs with electronic static copy, located beside the west facing and the south facing entrance doors of the building. The proposed signs are to be erected on the existing foundations, no structural data known about the foundations.**Church of the Holy Trinity**

    Applied Feb 4, 2015 · completed Nov 13, 2018 · Permit 15 108922 DST

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 239-247 Yonge Street

    67 storeys · 774 homes · Mixed use

    100 m away · Site plan · Under review · filed Jan 8, 2025

    Under review
  • 483-491 Bay Street and 20 Albert Street

    Not stated in the file

    140 m away · Subdivision · Under review · filed Sep 24, 2021

    Under review
  • 237 Victoria Street

    24 storeys · 256 homes · Residential

    190 m away · Site plan · Under review · filed Sep 1, 2022

    Under review
  • 595 Bay Street and 306 Yonge Street

    25 storeys · 224 homes · Mixed use

    210 m away · Subdivision · Under review · filed Nov 8, 2021

    Under review
  • 33 Dundas Street East

    Residential

    210 m away · Condominium · Under review · filed Oct 1, 2025

    Under review
  • 56-66 Bond Street

    6 storeys · Residential

    240 m away · Site plan · Under review · filed Dec 1, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 247 Yonge St · Minor variance

    To permit a place of amusement (arcade) use on this subject lot.

    110 m away · filed Aug 9, 2024 · Approved

  • 15 Shuter St · Minor variance

    To alter, the historic Massey Hall concert venue, by constructing, an eight storey rear addition with passerelles, along the east and west elevations of the building.

    200 m away · filed Mar 27, 2018 · Approved

  • 1 Dundas St W · Minor variance

    To erect a structure on the rooftop of 20 Queen Street West to support the establishment of a sign. 20 Queen Street West is a convenience address.

    140 m away · filed Jan 24, 2018 · Approved

  • 595 Bay St · Minor variance

    To modify the redevelopment plan approved under Site-specific By-law 1725-2013 by altering the existing non-residential building ("Atrium on Bay") by constructing a 6-storey addition plus mechanical penthouse above the west tower, a 5-storey addition plus mechanical penthouse above the east tower, a one-storey addition between the towers, a 2-storey addition to the west/south elevation, and interior alterations creating additional floor area. A concurrent Site Plan Application (12 131388 STE) is being processed.

    230 m away · filed Mar 1, 2017 · Approved

  • 595 Bay St · Minor variance

    To construct an accessible ramp on the south side of the existing commercial building (Atrium on Bay).

    230 m away · filed Sep 30, 2016 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.