Toronto address · Ward 9, Davenport
60 Ascot Ave
The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Under review
Small residential project · Multiple projects
Proposed new basement walkout, wood deck at rear and interior alterations to SFD.
Applied Aug 14, 2026 · Permit 26 219718 BLD
- Inspections under way
Plumbing
Plumbing - Proposed 1-storey rear addition and rebuild and increase size of rear semi-detached garage to existing dwelling.
Applied Jul 17, 2017 · issued Jul 17, 2017 · Permit 16 129092 PLB
- Revision issued
Small residential project · Multiple projects
Revision to roof - change slope roof to flat roof on rear one storey addition and detached garage
Applied Aug 18, 2016 · issued Aug 31, 2016 · Permit 16 129092 BLD (revision 01)
- Inspections under way
Small residential project · Multiple projects
Proposed 1-storey rear addition and rebuild and increase size of rear semi-detached garage to existing dwelling.
Applied Mar 17, 2016 · issued Jul 26, 2016 · Permit 16 129092 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
133 Boon Ave · Minor variance
To legalize and to maintain the rear fourth storey addition with a rooftop terrace (on the roof of the third storey), of the existing three-and-one-half-storey semi-detached dwelling (basement level is considered the first storey), that was constructed without an authorized building permit. Also, to permit the rear two-storey addition (located at the rear of the second and third storeys of the dwelling) that was constructed beyond the limits of an authorized building permit (19 212470 BLD 00 SR).
130 m away · filed Jun 4, 2026 · Approved
17 Day Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition and new stairs.
170 m away · filed Apr 25, 2023 · Withdrawn
70 Boon Ave · Minor variance
To construct a parking pad in the front yard of the existing two-and-one-half-storey semi-detached dwelling.
100 m away · filed Mar 28, 2023 · Withdrawn
51 Ascot Ave · Minor variance
To convert the existing one-storey ancillary building (detached garage in the rear yard, abutting St. Clair Gardens) into a two-storey ancillary building (containing a two-car garage on the ground level, and one garden suite that will occupy the second level), by constructing a complete second storey addition with two second storey side (west) juliette balconies. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit within the ancillary building).
60 m away · filed Oct 28, 2022 · Approved
149 Boon Ave · Minor variance
To construct a two-storey laneway suite (with an integral garage) at the rear of the existing three-storey detached dwelling.
170 m away · filed Aug 24, 2022 · Approved
124 Boon Ave · Minor variance
To alter the existing one-storey ancillary building (detached garage) by constructing a second storey addition in order to install a laneway suite.
140 m away · filed Nov 10, 2021 · Approved
43 Norton Ave · Minor variance
To construct a rear detached garage.
200 m away · filed Aug 25, 2021 · Refused
53 Boon Ave · Minor variance
To alter the existing 2½-storey semi-detached dwelling by constructing: a partial second storey addition; a third storey addition; a front basement walkout; front and rear second storey balconies; and a rear third storey balcony. Also, this dwelling will contain 4 dwelling units (1 primary and 3 secondary suites).
130 m away · filed Jun 30, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.