Toronto address · Ward 19, Beaches-East York
60 Balsam Ave
The City of Toronto has 5 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal to construct a two storey single family dwelling with integral garage and finished basement
Applied Oct 14, 2016 · issued Oct 27, 2016 · completed Jun 14, 2018 · Permit 16 124327 HVA
- Closed
Plumbing
Plumbing - Proposal to construct a two storey single family dwelling with integral garage and finished basement
Applied Mar 7, 2016 · issued Apr 20, 2016 · completed Nov 13, 2018 · Permit 16 124327 PLB
- Closed
New house · New building
Proposal to construct a two storey single family dwelling with integral garage and finished basement
Applied Mar 7, 2016 · issued Apr 20, 2016 · completed Oct 19, 2020 · 1 home added · Permit 16 124327 BLD
- Closed
Demolition
Proposal to demolish 3 storey single family detached dwelling
Applied Mar 7, 2016 · issued Apr 20, 2016 · completed Sep 1, 2017 · 1 home removed · Permit 16 124337 DEM
- Closed
Drains and site services
Drain - Proposal to construct a two storey single family dwelling with integral garage and finished basement
Applied Mar 7, 2016 · issued Apr 20, 2016 · completed Jun 14, 2018 · Permit 16 124327 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
26 Hazel Ave · Consent
To obtain consent to create a new easement/right-of-way.
230 m away · filed Feb 19, 2026 · Approved
52 Balsam Ave · Minor variance
To maintain the existing two-storey semi-detached dwelling (duplex). There is a total of two residential dwelling units on this lot.
80 m away · filed Feb 3, 2026 · Postponed
52 Balsam Ave · Minor variance
To maintain the existing two-storey semi-detached dwelling (duplex). There is a total of two residential dwelling units on this lot.
80 m away · filed Feb 3, 2026 · Postponed
52 Balsam Ave · Consent
To obtain consent to sever the property into two residential lots.
80 m away · filed Feb 3, 2026 · Postponed
34 Balsam Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear second storey addition (above a portion of the existing rear ground floor) with a new roof (for the remaining portion of the existing rear ground floor), and a new rear ground floor deck with stairs. The existing rear ground floor deck will be demolished.
220 m away · filed Aug 25, 2025 · Approved
155 Maclean Ave · Minor variance
To construct a new one-and-one-half-storey ancillary building (detached garage) in the rear yard. The existing semi-detached ancillary building (garage) will be demolished.
150 m away · filed Sep 8, 2023 · Approved
2343 Queen St E · Minor variance
To construct a new five-storey mixed-use building with non-residential uses on the ground floor and a total of 10 residential dwelling units (on levels two to five), with front and rear balconies on each level. A total of two parking spaces will be provided at the rear of the property.
90 m away · filed Mar 10, 2023 · Approved
116 Glen Manor Dr · Minor variance
116 Glen Manor Drive which partially being used as clinic, pharmacy and residential units. Proposal to extend the existing building 15 ft towards Queen St E so that we can add a commercial retail unit on the ground floor and residential units on the top floors which are facing Queen Street East. Also, proposing a fourth floor for additional residential units and basement extension for additional three residential units and storage room. Proposed GFA 1483.2 and height 11m.
240 m away · filed Dec 22, 2022 · Application withdrawn
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.