Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

60 Fulton Ave

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Party wall admin permits

    Party wall permit in relation to 18-167352

    Applied May 29, 2018 · issued Jun 20, 2018 · completed Mar 1, 2023 · Permit 18 167362 BLD

    Closed
  • Drains and site services · Back water valve (Sewer only)

    Proposal to install back water valve in the existing single family dwelling.

    Applied May 11, 2018 · issued May 14, 2018 · completed Aug 3, 2018 · Permit 18 157030 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 120 Fulton Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey dormer addition with a rooftop deck.

    170 m away · filed Jul 29, 2026 · Hearing scheduled

  • 20 Butternut St · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a one-storey addition to the north side of the existing rear two-storey portion of the dwelling, a new rear ground floor deck and stairs, and to extend the rear ground floor patio. Also, to construct a third floor west side dormer addition, and a rear rooftop deck (above the second storey portion of the dwelling).

    230 m away · filed Jul 8, 2026 · Hearing scheduled

  • 59 Fulton Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a partial front one-storey addition (partial porch enclosure) and a new front walkway (pavers). The existing dwelling (containing two residential dwelling units) will be converted into one residential dwelling unit.

    60 m away · filed Apr 8, 2026 · Approved

  • 90 Fulton Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front third storey dormer (the existing dormer will be demolished), a rear third storey addition, a rear three-storey addition with a rear basement walkout, and a rear ground floor deck with stairs.

    70 m away · filed Jun 24, 2025 · Approved

  • 80 Nealon Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, and a rear ground floor covered deck with a rear basement extension below.

    160 m away · filed Aug 1, 2024 · Approved

  • 141 Arundel Ave · Minor variance

    To alter the existing three-storey semi-detached dwelling by constructing a rear one-storey addition (to replace the existing one-storey addition).

    220 m away · filed Jul 11, 2024 · Approved

  • 94 Fulton Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear terrace (above the second storey roof), a front second storey terrace (above the front porch), and a rear ground floor deck with stairs. The existing front porch and front second storey balcony will be reconstructed.

    80 m away · filed Apr 3, 2024 · Approved

  • 55 Fulton Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a one-storey rear addition (with basement), a ground floor (east) side porch and stairs, as well as a rear ground floor terrace. The existing rear (ground and second floor) decks will be demolished.

    50 m away · filed Aug 23, 2023 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.