Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

60 Jones Ave

The City of Toronto has 11 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    REV 01: Main plumbing stack relocated to north side of dwelling.Plumbing - Proposal for multiple projects to an existing 2 storey SFD-detached dwelling. Scope of work includes a 2 storey rear addition, new 3rd and 4th floor (mechanical penthouse) additions, interior alterations, 3rd floor balcony, 2 rooftop terraces and the conversion to 5 units. See also 21 141191 MV and Final and Binding A0497/21TEY.

    Applied Dec 6, 2022 · issued Dec 15, 2022 · completed Aug 16, 2023 · Permit 21 246420 PLB (revision 01)

    Closed
  • Heating and ventilation

    REVISION - changes as per the drawingsHVAC - Proposal for multiple projects to an existing 2 storey SFD-detached dwelling. Scope of work includes a 2 storey rear addition, new 3rd and 4th floor (mechanical penthouse) additions, interior alterations, 3rd floor balcony, 2 rooftop terraces and the conversion to 5 units. See also 21 141191 MV and Final and Binding A0497/21TEY.

    Applied Nov 17, 2022 · issued Dec 15, 2022 · completed Aug 9, 2023 · Permit 21 246420 HVA (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposal for multiple projects to an existing 2 storey SFD-detached dwelling. Scope of work includes a 2 storey rear addition, new 3rd and 4th floor (mechanical penthouse) additions, interior alterations, 3rd floor balcony, 2 rooftop terraces and the conversion to 5 units. See also 21 141191 MV and Final and Binding A0497/21TEY.

    Applied Dec 22, 2021 · issued Aug 19, 2022 · completed Aug 9, 2023 · Permit 21 246420 HVA

    Closed
  • Small residential project · Multiple projects

    Proposal for multiple projects to an existing 2 storey SFD-detached dwelling. Scope of work includes a 2 storey rear addition, new 3rd and 4th floor (mechanical penthouse) additions, interior alterations, 3rd floor balcony, 2 rooftop terraces and conversion from an existing single family dwelling to a detached dwelling with three (3) dwelling units. See also 21 141191 MV and Final and Binding A0497/21TEY.

    Applied Dec 8, 2021 · issued Aug 19, 2022 · completed Aug 16, 2023 · 2 homes added · Permit 21 246420 BLD

    Closed
  • Plumbing

    Plumbing - Proposal for multiple projects to an existing 2 storey SFD-detached dwelling. Scope of work includes a 2 storey rear addition, new 3rd and 4th floor (mechanical penthouse) additions, interior alterations, 3rd floor balcony, 2 rooftop terraces and the conversion to 5 units. See also 21 141191 MV and Final and Binding A0497/21TEY.

    Applied Dec 8, 2021 · issued Aug 19, 2022 · completed Aug 16, 2023 · Permit 21 246420 PLB

    Closed
  • Heating and ventilation

    HVAC - New laneway suite

    Applied Jun 15, 2021 · issued Jul 5, 2021 · completed Jan 30, 2024 · Permit 21 151133 HVA

    Closed
  • Drains and site services

    Drain - Proposal for basement underpinning.

    Applied May 17, 2021 · issued May 26, 2021 · completed Aug 25, 2023 · Permit 21 155764 DRN

    Closed
  • Small residential project · Underpinning

    Proposal for basement underpinning.

    Applied May 17, 2021 · issued May 26, 2021 · completed Aug 25, 2023 · Permit 21 155764 BLD

    Closed
  • Plumbing

    Plumbing - New laneway suite

    Applied May 6, 2021 · issued Jun 15, 2021 · completed Dec 7, 2023 · Permit 21 151133 PLB

    Closed
  • Small residential project · New laneway / rear yard suite

    New laneway suite

    Applied May 6, 2021 · issued Jun 15, 2021 · completed Jan 30, 2024 · 1 home added · Permit 21 151133 BLD

    Closed
  • Small residential project · Porch

    reconstruct front verandah

    Applied Apr 24, 2001 · issued Apr 24, 2001 · Permit 01 129742 CMB

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a third storey addition above the existing dwelling, a three-storey rear addition, a fourth floor mechanical penthouse, and a roof top patio. A total of four secondary suites are proposed.

    Decision: Approved (hearing Oct 28, 2021)

    Filed Apr 15, 2021 · File A0497/21TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 27 Brooklyn Ave · Minor variance

    220 m away · filed Aug 21, 2026 · Postponed

  • 58 Jones Ave · Minor variance

    To construct a new detached four-storey apartment building (containing seven residential dwelling units) with a front entrance with stairs, a side (north) covered entrance with stairs, a rear ground floor entrance with stairs and a partially enclosed waste storage in the front yard. Also, to construct a rear detached two-storey ancillary building (containing one laneway suite) with a rear (west) covered entrance and one visitor parking space, abutting the laneway. Further, to construct a rear one-storey detached ancillary building (containing 12 bicycle parking spaces). There will be a total…

    10 m away · filed Jun 25, 2026 · Approved

  • 45 Jones Ave · Minor variance

    To legalize and maintain the existing rear two-storey addition, including a basement extension below with a walkout, a rear second floor balcony (above the garage), and side (north) exterior staircases (one leading to the ground level and one leading to the second level), which was constructed without an authorized building permit.This addition will be abutting the existing one-storey detached ancillary building (garage), will not be accessible through the main portion of the dwelling and will have separate accesses to each level. There will be one residential dwelling unit on this lot.

    60 m away · filed Jul 22, 2025 · Refused

  • 53 Bertmount Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition.

    130 m away · filed Apr 14, 2025 · Approved

  • 81 Coady Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition with a rear balcony. Also, to construct a new one-storey front enclosed porch (mudroom) with stairs.

    100 m away · filed Dec 30, 2024 · Approved

  • 23 Curzon St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with a ground floor deck and stairs.

    190 m away · filed Oct 16, 2024 · Approved

  • 1128 Queen St E · Minor variance

    To alter the existing two-storey mixed-use building by constructing a rear two-storey addition with second storey balcony and exterior stairs. There is one non-residential unit (restaurant) on the ground floor, and one residential dwelling unit on the second level, which will be maintained. The existing rear one-storey ancillary building (detached garage) will be demolished. There will be one-car parking pad, abutting Bertmount Avenue.

    230 m away · filed Sep 30, 2024 · Approved

  • 96 Bertmount Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a new rear two-storey addition (the second floor addition will be partially cantilevered at the southwest portion of the dwelling), and a rear third floor addition. Also, to construct new rear ground level stairs.

    220 m away · filed Jul 9, 2024 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.