Toronto address · Ward 8, Eglinton-Lawrence
60 McNairn Ave
The City of Toronto has 4 building permits since 2017 and 2 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal for 3rd storey addition and interior alteration to convert the single family dwelling to a fourplex
Applied May 22, 2025 · issued Aug 26, 2025 · completed Oct 9, 2025 · Permit 25 163467 HVA
- Closed
Plumbing
Plumbing - Proposal for 3rd storey addition and interior alteration to convert the single family dwelling to a fourplex
Applied May 22, 2025 · issued Aug 26, 2025 · completed Oct 9, 2025 · Permit 25 163467 PLB
- Closed
Small residential project · Multiple projects
Proposed third storey addition, interior alterations, deck, and walk-out to convert atwo-storey, two unit, semi-detached dwelling to a four unit (fourplex) three-storey, semi-detached dwelling -PART 1( FOR PART 2 REFER TO 25 163322 BLD00 SR)
Applied May 22, 2025 · issued Aug 26, 2025 · completed Nov 18, 2025 · 4 homes added · Permit 25 163467 BLD
- Closed
Drains and site services
Drain - Proposal for 3rd storey addition and interior alteration to convert the single family dwelling to a fourplex
Applied May 22, 2025 · issued Aug 26, 2025 · completed Nov 18, 2025 · Permit 25 163467 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Accepted
Minor variance · New R building
Filed May 7, 2024 · File A0249/24NY
- Closed
Minor variance · R addition
Interior alterations to the existing 2 storey duplex, third floor addition, and conversion to a fourplex. File numbers B0017/24NY , A0208/24NY & A0209/24NY will be jointly considered.(The application was deferred from the hearing on 15 August 2024)
Decision: Approved (hearing Oct 24, 2024)
Filed Apr 12, 2024 · File A0208/24NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
17 Brooke Ave · Minor variance
Proposal to construct a new two-storey detached dwelling with a partially covered rear deck.
80 m away · filed Jul 17, 2026 · Approved
3 Brooke Ave · Minor variance
To alter the existing detached dwelling by constructing a new front porch.
180 m away · filed May 22, 2026 · Approved
71 Yonge Blvd · Minor variance
To construct one-storey addition (attached garage) to the north side of the existing detached dwelling, as well as a one-storey front entry addition.
50 m away · filed May 12, 2026 · Approved
32 Yonge Blvd · Minor variance
To construct a new third storey deck.
120 m away · filed May 4, 2026 · Deferred
31 McNairn Ave · Minor variance
To alter the existing detached dwelling by constructing a one-storey rear addition (sunroom) and a new rear deck.
110 m away · filed Apr 28, 2026 · Approved
3 Mason Blvd · Minor variance
To alter the existing two-storey detached dwelling by constructing additions to the front and north side of the dwelling, a new second storey and a third storey addition.
220 m away · filed Dec 18, 2025 · Approved
46 Brooke Ave · Minor variance
To construct a new 3-storey detached dwelling with an integral garage, a covered front porch and a covered rear deck.
160 m away · filed Dec 18, 2025 · Approved
51 Yonge Blvd · Minor variance
To construct a new 3-storey detached dwelling with an integral garage.
40 m away · filed Dec 9, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.