Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 16, Don Valley East

60 Mobile Dr

The City of Toronto has 19 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Fire and security upgrade · Sprinklers

    Proposal for alterations to sprinkler system.

    Applied Apr 14, 2026 · issued May 7, 2026 · Permit 26 143520 FSU

    Permit issued
  • Heating and ventilation

    Revision 01 - Adding ductwork exhaust system to new washrooms on lvl 2 lvlv 3 and lvl 5 and expansion of office on lvl 2 into tenant fit-out area.HVAC - Three storey office building with a mechanical penthouse and a one storey below grade parking. The above grade levels will consist of office space and a meeting room, the below grade level will consist of car parking, office space and subsidiary storage and service spaces. Mass Timber Construction

    Applied Sep 26, 2024 · issued Nov 27, 2024 · completed May 6, 2026 · Permit 20 161333 HVA (revision 01)

    Closed
  • Plumbing

    Revision 01 - Adding washrooms on lvl 2 lvlv 3 and lvl 5 and expansion of office on lvl 2 into tenant fit-out area.Plumbing - Three storey office building with a mechanical penthouse and a one storey below grade parking. The above grade levels will consist of office space and a meeting room, the below grade level will consist of car parking, office space and subsidiary storage and service spaces. Mass Timber Construction

    Applied Sep 18, 2024 · issued Oct 4, 2024 · Permit 20 161333 PLB (revision 01)

    Revision issued
  • New building

    Revision 01 - Adding washrooms on lvl 2 lvlv 3 and lvl 5 and expansion of office on lvl 2 into tenant fit-out area.Three storey office building with a mechanical penthouse and a one storey below grade parking. The above grade levels will consist of office space and a meeting room, the below grade level will consist of car parking, office space and subsidiary storage and service spaces. Mass Timber Construction

    Applied Sep 2, 2024 · issued Oct 17, 2024 · completed May 1, 2026 · Permit 20 161333 BLD (revision 01)

    Closed
  • Designated structure · Sign building permit related

    Install First party ground sign**Teachers Federation**

    Applied Nov 14, 2023 · issued Nov 14, 2023 · completed May 6, 2024 · Permit 23 225890 DST

    Closed
  • Designated structure · Sign building permit related

    Install 1 first party ground sign**60 Mobile Tenant sign**

    Applied Oct 26, 2023 · completed Oct 30, 2023 · Permit 23 219068 DST

    Cancelled
  • Designated structure · Other

    Rooftop pv panel part of permit 20 161333 bld 00 nb

    Applied Feb 23, 2023 · issued Mar 23, 2023 · completed May 1, 2026 · Permit 23 116675 DST

    Closed
  • Conditional permit · Partial permit - structural framing

    Conditional Permit - Part Permit - Three storey office building with a mechanical penthouse and a one storey below grade parking. The above grade levels will consist of office space and a meeting room, the below grade level will consist of car parking, office space and subsidiary storage and service spaces. Mass Timber Construction

    Applied Feb 16, 2022 · issued May 13, 2022 · completed Nov 10, 2022 · Permit 20 161333 STR

    Cancelled
  • Conditional permit · Partial permit - foundation

    Conditional Permit - Foundation Part Permit - Three storey office building with a mechanical penthouse and a one storey below grade parking. The above grade levels will consist of office space and a meeting room, the below grade level will consist of car parking, office space and subsidiary storage and service spaces. Mass Timber Construction

    Applied Sep 30, 2021 · issued Oct 21, 2021 · completed May 16, 2022 · Permit 20 161333 FND

    Closed
  • Conditional permit · Partial permit - shoring

    Conditional Permit - Part Permit - Three storey office building with a mechanical penthouse and a one storey below grade parking. The above grade levels will consist of office space and a meeting room, the below grade level will consist of car parking, office space and subsidiary storage and service spaces. Mass Timber Construction

    Applied Jul 6, 2021 · issued Sep 27, 2021 · completed Oct 21, 2021 · Permit 20 161333 SHO

    Closed
  • Demolition

    Demolish the existing one storey office building less (one) foundation wall is to remain - which will be shored.

    Applied Aug 20, 2020 · issued Sep 17, 2020 · completed May 21, 2021 · Permit 20 183100 DEM

    Closed
  • Fire and security upgrade

    FS - Fire suppression sprinkler system for building.Three storey office building with a mechanical penthouse and a one storey below grade parking. The above grade levels will consist of office space and a meeting room, the below grade level will consist of car parking, office space and subsidiary storage and service spaces. Mass Timber Construction

    Applied Aug 14, 2020 · completed Apr 11, 2024 · Permit 20 161333 FSU

    Closed
Show 7 more permits
  • Alternative solution

    Sentence 3.1.7.1.(1) requires the fire-resistance ratings for assemblies to be based on testing in accordance with CAN/ULC-S101 or on the basis of MMAH Supplementary Standard SB-2. Annex B of CSA O86 has been developed to determine fire-resistance ratings for mass timber elements based on previous testing to CAN/ULC-S101, but it is not yet part of the OBC acceptable solutions (although it is accepted in other jurisdictions). For this building, use of Annex B is proposed for the mass timber.

    Applied Jul 23, 2020 · completed Dec 29, 2020 · Permit 20 171552 ALT

    Approved
  • Heating and ventilation

    HVAC - Three storey office building with a mechanical penthouse and a one storey below grade parking. The above grade levels will consist of office space and a meeting room, the below grade level will consist of car parking, office space and subsidiary storage and service spaces. Mass Timber Construction

    Applied Jun 29, 2020 · issued May 13, 2022 · completed May 6, 2026 · Permit 20 161333 HVA

    Closed
  • Drains and site services · Site service

    Site Service - Three storey office building with a mechanical penthouse and a one storey below grade parking. The above grade levels will consist of office space and a meeting room, the below grade level will consist of car parking, office space and subsidiary storage and service spaces. Mass Timber Construction

    Applied Jun 29, 2020 · issued Nov 15, 2022 · completed Jul 22, 2026 · Permit 20 161333 STS

    Closed
  • Drains and site services

    Foundation Inside Drain - Three storey office building with a mechanical penthouse and a one storey below grade parking. The above grade levels will consist of office space and a meeting room, the below grade level will consist of car parking, office space and subsidiary storage and service spaces. Mass Timber Construction

    Applied Jun 29, 2020 · issued Oct 21, 2021 · Permit 20 161333 DRN

    Inspections under way
  • New building

    Three storey office building with a mechanical penthouse and a one storey below grade parking. The above grade levels will consist of office space and a meeting room, the below grade level will consist of car parking, office space and subsidiary storage and service spaces. Mass Timber Construction

    Applied Jun 29, 2020 · issued Nov 10, 2022 · completed May 1, 2026 · Permit 20 161333 BLD

    Closed
  • Plumbing

    Plumbing - Three storey office building with a mechanical penthouse and a one storey below grade parking. The above grade levels will consist of office space and a meeting room, the below grade level will consist of car parking, office space and subsidiary storage and service spaces. Mass Timber Construction

    Applied Jun 29, 2020 · issued May 13, 2022 · Permit 20 161333 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Darton property advisors - Renovations

    Applied Jun 25, 2008 · issued Jul 29, 2008 · completed Sep 18, 2026 · Permit 08 175087 HVA

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 3 Swift Drive

    28 storeys · 824 homes · Residential

    290 m away · Site plan · Under review · filed Dec 24, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 35 Mobile Dr · Consent

    To obtain consent to sever the property into two lots. Existing buildings will remain and no new construction is proposed at this time. Related planning file includes B0018/20NY.

    210 m away · filed Feb 4, 2022 · Approved

  • 25 Old Eglinton Ave · Minor variance

    To construct an addition for Vehicle Storage and aTraining Room, and to remove the existing grass island near the street and widen the driveway.

    200 m away · filed Jul 30, 2020 · Approved

  • 57 Mobile Dr · Minor variance

    To construct a new office building.

    90 m away · filed Jun 17, 2020 · Approved

  • 57 Mobile Dr · Consent

    To obtain consent to sever the Property into three parcels and to create various easements and road widenings.

    90 m away · filed Jun 17, 2020 · Approved

Everything planned in Don Valley East

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.