Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 20, Scarborough Southwest

61 Presley Ave

The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Rev 01 - to demolish exterior existing walls, changing windows and new proposed lateral support wall. Proposed interior alterations to existing one storey sfd, second storey addition, two storey rear addition, basement underpinning with walkout, front and rear decks.

    Applied Nov 20, 2017 · issued Dec 12, 2017 · completed Jul 30, 2018 · Permit 17 219457 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposed interior alterations to existing one storey sfd, second storey addition, two storey rear addition, basement underpinning with walkout, front and rear decks.

    Applied Aug 19, 2017 · issued Sep 8, 2017 · completed Jul 25, 2018 · Permit 17 219457 HVA

    Closed
  • Plumbing

    Plumbing - Proposed interior alterations to existing one storey sfd, second storey addition, two storey rear addition, basement underpinning with walkout, front and rear decks.

    Applied Aug 19, 2017 · issued Sep 8, 2017 · completed Jul 25, 2018 · Permit 17 219457 PLB

    Closed
  • Small residential project · Multiple projects

    Proposed interior alterations to existing one storey sfd, second storey addition, two storey rear addition, basement underpinning with walkout, front and rear decks.

    Applied Aug 19, 2017 · issued Sep 8, 2017 · completed Jul 30, 2018 · Permit 17 219457 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    The applicant is seeking relief from the provisions of the Zoning By-law to construct a two-storey addition to the rear of the exiting dwelling.

    Decision: Approved (hearing Jul 13, 2017)

    Filed Apr 21, 2017 · File A0129/17SC

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 11 Florens Ave · Minor variance

    To demolish the existing one-storey dwelling and to construct a new two-storey multiplex dwelling. This item was previously deferred at the December 4, 2024 hearing.

    170 m away · filed Oct 3, 2024 · Approved

  • 87 Presley Ave · Minor variance

    To construct a new dwelling.

    210 m away · filed Sep 13, 2022 · Approved

  • 61 Bertha Ave · Minor variance

    To permit the construction of a new two storey detached dwelling with an integral garage. This proposal requires variances to the Zoning By-law.

    130 m away · filed Oct 4, 2021 · Approved

  • 10 Penaire St · Consent

    To obtain consent to sever the property into two residential lots (Part 1 and Part 2).

    150 m away · filed Aug 23, 2021 · Refused

  • 10 Penaire St · Minor variance

    To construct a new two-storey detached dwelling.

    150 m away · filed Aug 23, 2021 · Refused

  • 10 Penaire St · Minor variance

    To construct a new two-storey detached dwelling.

    150 m away · filed Aug 23, 2021 · Refused

  • 25 Presley Ave · Minor variance

    To construct a new rear elevated deck.

    210 m away · filed Oct 6, 2020 · Approved

  • 14 Penaire St · Consent

    To obtain consent to sever the property into two residential lots.

    130 m away · filed Jul 22, 2020 · Refused

Everything planned in Scarborough Southwest

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.