61 Vermont Ave
The City of Toronto has 1 building permit since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Multiple projects
reconstruct 3rd floor, deck and addition.
Applied Jul 14, 2022 · issued Mar 17, 2023 · Permit 22 176686 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a partial rear third storey addition with a rooftop deck.
Decision: Approved (hearing Feb 8, 2023)
Filed Oct 25, 2022 · File A1170/22TEY
What’s planned nearby
Development sites within 500 m
- Approved
9 storeys · 65 homes · Mixed use
280 m away · Site plan · Approved · filed Feb 22, 2022
Neighbours’ Committee of Adjustment files within 250 m
908 Manning Ave · Minor variance
To alter the existing rear one-storey detached ancillary building (garage, abutting the laneway) by constructing an east side ground floor addition (including an access staircase) and a complete second storey addition. Also, to legalize and to maintain the concrete foundation walls which were constructed beyond an authorized building permit. This ancillary building will contain a two-car garage on the ground level, and one laneway suite on the second level. There will be a total of two residential dwelling units on this lot (one unit within the main building and one unit within the ancillary…
100 m away · filed Jun 23, 2026 · Refused
60 Olive Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with stairs. The existing rear ground level deck will be demolished.
180 m away · filed May 20, 2026 · Approved
871 Palmerston Ave · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a rear second storey addition (above the rear one-storey portion of the dwelling).
180 m away · filed Apr 7, 2026 · Approved
908 Manning Ave · Minor variance
To alter the existing rear one-storey ancillary building (semi-detached garage, abutting the laneway) by constructing a complete second storey addition, and a two-storey addition at the east portion of the building, including a basement addition below. This ancillary building will contain a two-car garage on the ground level, and one laneway suite of the second level. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling, and one unit within the ancillary building).
100 m away · filed Nov 14, 2025 · Refused
844 Manning Ave · Minor variance
To construct a new one-storey detached ancillary building (one-car garage) in the rear yard, abutting the laneway.
190 m away · filed Jul 10, 2025 · Approved
869 Palmerston Ave · Minor variance
To alter the existing two-storey townhouse by constructing a rear second storey addition.
170 m away · filed Jun 13, 2025 · Approved
606 Clinton St · Minor variance
To alter the existing one-storey ancillary building, in the rear yard, abutting the laneway, by constructing a complete second storey addition. This building will contain one parking space and one laneway suite.
200 m away · filed Dec 17, 2024 · Approved
33 Vermont Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear one-storey addition with a new deck. Also, to reconstruct the side west cantilevered bay window on the first level.
80 m away · filed Jul 15, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.