Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

62 Dewhurst Blvd

The City of Toronto has 6 building permits since 2017 (6 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Proposal to install a backwater valve on the sanitary line in an existing SFD-detached dwelling.

    Applied Mar 25, 2019 · issued Mar 25, 2019 · Permit 19 130344 DRN

    Inspections under way
  • Small residential project · Addition(s)

    REVISION 2 - Change wall detail for the rear additionProposal to construct a 1 storey rear addition and 3rd storey addition to existing single family dwelling

    Applied Feb 22, 2019 · issued Mar 21, 2019 · Permit 18 191738 BLD (revision 02)

    Revision issued
  • Heating and ventilation

    HVAC - Proposal to construct a 1 storey rear addition and 3rd storey addition to existing single family dwelling

    Applied Jan 2, 2019 · issued Jan 14, 2019 · Permit 18 191738 HVA

    Inspections under way
  • Small residential project · Addition(s)

    REVISION - reduce the size of the rear addition, rear addition on piersProposal to construct a 1 storey rear addition and 3rd storey addition to existing single family dwelling

    Applied Nov 12, 2018 · issued Nov 26, 2018 · Permit 18 191738 BLD (revision 01)

    Revision issued
  • Small residential project · Addition(s)

    Proposal to construct a 1 storey rear addition and 3rd storey addition to existing single family dwelling

    Applied Jul 10, 2018 · issued Aug 8, 2018 · Permit 18 191738 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct a 1 storey rear addition and 3rd storey addition to existing single family dwelling

    Applied Jul 10, 2018 · issued Aug 8, 2018 · Permit 18 191738 PLB

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing two-storey detached dwelling by constructing a one-storey rear addition with deck and a third storey above the existing second floor.

    Decision: Approved (hearing May 23, 2018)

    Filed Aug 28, 2017 · File A0939/17TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 975 Danforth Avenue

    10 storeys · 57 homes · Mixed use

    300 m away · Site plan · Under review · filed May 12, 2022

    Under review
  • 1095-1111 Danforth Avenue

    13 storeys · Mixed use

    460 m away · Site plan · Approved · filed Mar 24, 2022

    Approved
  • 654-668 Danforth Avenue

    49 storeys · 496 homes · Mixed use

    480 m away · Site plan · Under review · filed Aug 3, 2022

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 98 Dewhurst Blvd · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third storey addition.

    120 m away · filed May 26, 2026 · Approved

  • 38 Woodycrest Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition with rear ground floor deck with stairs and reconstructing front ground floor porch with stairs. Also, to construct a new one-storey detached ancillary building (two-car garage) in the rear yard, abutting the laneway.

    200 m away · filed Mar 19, 2026 · Approved

  • 40 Donlands Ave · Minor variance

    To alter the existing two-storey Place of Worship (Greek Orthodox Church) by constructing a two-storey addition (elevator vestibule) at the northeast corner of the building.

    190 m away · filed Feb 27, 2026 · Approved

  • 135 Dewhurst Blvd · Minor variance

    To construct a new one-storey detached ancillary building (one-car garage), in the rear yard, abutting Somers Avenue.

    240 m away · filed Oct 10, 2025 · Approved

  • 41 Dewhurst Blvd · Minor variance

    To permit the existing two-and-one-half-storey semi-detached dwelling by constructing a rear one-storey addition with a deck and stairs. There will be a total of two residential dwelling units on this lot (one unit occupying the basement and first storey, and one unit occupying the second and third storeys).

    100 m away · filed Jun 19, 2025 · Approved

  • 53 Woodycrest Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front one-storey addition with a covered porch, front partial second and third storey additions, a rear basement walkout, and a rear three-storey addition with decks on the first, second, and third levels. Also, to construct a new parking pad in the rear yard of the property, abutting the laneway. The existing rear ancillary building (detached garage) will be demolished. There will be a total of three residential dwelling units on this lot (Unit 1 will occupy the basement and first level, Unit 2 will occupy…

    150 m away · filed Apr 30, 2025 · Approved

  • 97 Woodycrest Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third storey addition with a balcony.

    250 m away · filed Mar 21, 2025 · Approved

  • 30 Milverton Blvd · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition with a rooftop deck (above the second storey), a rear two-storey addition, and a rear ground floor deck with stairs and a patio at-grade (the existing rear ground floor deck will be demolished). Also, to construct a one-storey ancillary building (shed) in the rear yard of the property.

    200 m away · filed Feb 7, 2025 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.