Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 23, Scarborough North

62 Glen Watford Dr

The City of Toronto has 2 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - BUILD A NEW REAR YARD GARDEN SUITE

    Applied Aug 20, 2026 · Permit 26 222945 PLB

    Issuance pending
  • Small residential project · New laneway / rear yard suite

    Build a new rear yard garden suite

    Applied Aug 20, 2026 · 1 home added · Permit 26 222945 BLD

    Issuance pending

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 80 Glen Watford Dr · Minor variance

    To construct a new two-storey duplex with an attached garage. The existing dwelling will be demolished. This application was previously deferred at the August 3, 2025 hearing.

    210 m away · filed May 14, 2025 · Approved

  • 64 Glen Watford Dr · Minor variance

    To construct a new two-storey detached dwelling. The existing one-storey detached dwelling will be demolished. Cross-reference previous Minor Variance Application A0110/21SC.

    30 m away · filed Nov 15, 2024 · Approved

  • 66 Glen Watford Dr · Minor variance

    To demolish the existing dwelling and to construct a new two-storey detached dwelling. Cross reference previous Minor Variance application at this property A0111/21SC.

    60 m away · filed Nov 15, 2024 · Approved

  • 40 Marydon Cres · Minor variance

    To permit the existing driveway. The existing two-storey detached dwelling on the lot will be maintained and unaltered. This application was deferred at the July 9, 2025 hearing.

    160 m away · filed Aug 7, 2024 · Approved

  • 38 Marydon Cres · Minor variance

    To permit the existing driveway. The existing two-storey detached dwelling on the lot will be maintained and unaltered. This application was deferred at the July 9, 2025 hearing.

    150 m away · filed Aug 7, 2024 · Approved

  • 2657 Midland Ave · Minor variance

    To permit the construction of a new, two-storey dwelling fronting Montgomery Avenue. Refer to Consent Application B0065/21SC and Minor Variance Application A0342/21SC.

    140 m away · filed Oct 6, 2021 · Refused

  • 2657 Midland Ave · Consent

    To permit the severance of the rear portion of 2357/2359 Midland Avenue to create a new residential lot to be conveyed fronting on Montgomery Avenue. The proposed new lot is to be constructed with a new two-storey dwelling. No alterations to the existing dwelling are proposed which will remain on the proposed retained lot. This development proposal requires variances to the regulations of the existing Zoning By-law(s). NOTE: This application was deferred on May 5, 2022 in order to accurately identify all required variances to the Zoning By-laws. Cross Reference Minor Variance Applications A03…

    140 m away · filed Oct 6, 2021 · Refused

  • 2657 Midland Ave · Minor variance

    To permit the existing dwelling to remain on the proposed retained lot. No alterations are proposed to the existing dwelling. Refer to Consent Application B0065/21SC and Minor Variance Application A0341/21SC.

    140 m away · filed Oct 6, 2021 · Refused

Everything planned in Scarborough North

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.