Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 6, York Centre

62 Hove St

The City of Toronto has 5 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Two storey single family dwelling with unfinished basement ( existing detached garage ).

    Applied Apr 7, 2014 · issued Apr 16, 2014 · Permit 11 260648 HVA

    Inspections under way
  • New house · New building

    Revisions to original building permit drawings. (see attached list)

    Applied May 9, 2012 · issued Mar 6, 2013 · Permit 11 260648 BLD (revision 01)

    Revision issued
  • Plumbing

    Plumbing - Two storey single family dwelling with unfinished basement ( existing detached garage ).

    Applied Apr 27, 2012 · issued Apr 27, 2012 · Permit 11 260648 PLB

    Inspections under way
  • Drains and site services

    Drain - Two storey single family dwelling with unfinished basement ( existing detached garage ).

    Applied Apr 27, 2012 · issued Apr 27, 2012 · Permit 11 260648 DRN

    Inspections under way
  • New house · New building

    Two storey single family dwelling with unfinished basement ( existing detached garage ).

    Applied Aug 19, 2011 · issued Oct 25, 2011 · 1 home added · Permit 11 260648 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 96 Codsell Ave · Minor variance

    230 m away · filed Sep 15, 2026 · Tentatively scheduled

  • 100 Waterloo Ave · Minor variance

    To alter the existing detached dwelling by constructing a new rear deck.

    230 m away · filed Jun 10, 2026 · Approved on condition

  • 78 Waterloo Ave · Minor variance

    Proposal for a front canopy, and a rear and second floor addition.

    120 m away · filed May 17, 2024 · Approved

  • 69 Searle Ave · Minor variance

    To construct a one storey addition and interior alternations.

    150 m away · filed Sep 8, 2022 · Approved

  • 96 Codsell Ave · Minor variance

    To construct a new dwelling.

    230 m away · filed Apr 24, 2021 · Approved

  • 14 Codsell Ave · Minor variance

    To construct a one-storey front addition and a rear yard deck.

    210 m away · filed May 27, 2020 · Approved

  • 60 Codsell Ave · Minor variance

    To construct a new residential dwelling. File Numbers B0028/18NY, A0354/18NY and A0355/18NY will be considered jointly.

    70 m away · filed May 3, 2018 · Refused

  • 60 Codsell Ave · Consent

    To obtain consent to sever the property into two undersized lots.

    70 m away · filed May 3, 2018 · Refused

Everything planned in York Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.