Toronto address · Ward 20, Scarborough Southwest
62 Sharpe St
The City of Toronto has 3 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Multiple projects
Construct a new 2nd storey plus interior alterations to an existing bungalow, front porch
Applied Jul 22, 2015 · issued Aug 27, 2015 · Permit 15 195099 BLD
- Inspections under way
Heating and ventilation
HVAC - Construct a new 2nd storey plus interior alterations to an existing bungalow, front porch
Applied Jul 22, 2015 · issued Jan 27, 2016 · Permit 15 195099 HVA
- Inspections under way
Plumbing
Plumbing - Construct a new 2nd storey plus interior alterations to an existing bungalow, front porch
Applied Jul 22, 2015 · issued Aug 27, 2015 · Permit 15 195099 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
10 storeys · 223 homes · Mixed use
370 m away · Site plan · Approved · filed Nov 18, 2021
Neighbours’ Committee of Adjustment files within 250 m
54 Park St · Consent
To obtain consent to sever the property into two residential lots. The existing one-storey detached dwelling will be demolished. NOTE: The Committee of Adjustment previously approved the severance of the land into two residential lots in 2022 under Decision B0020/21SC. However, the provisional consent of this consent application lapsed because the conditions were not satisfied within the statutory deadline. NOTE: This application was previously deferred at the Committee of Adjustment Hearing on December 3, 2025.
140 m away · filed Aug 27, 2025 · Approved
54 Park St · Minor variance
To construct a new two-storey detached dwelling (duplex) with a front porch, rear deck, front balcony and rear balcony. The existing one-storey detached dwelling will be demolished. NOTE: This application was previously deferred at the Committee of Adjustment Hearing on December 3, 2025.
140 m away · filed Aug 18, 2025 · Approved
54 Park St · Minor variance
To construct a new two-storey detached dwelling (duplex) with a front yard porch, front balcony and rear balcony. The existing one-storey detached dwelling will be demolished. NOTE: This application was previously deferred at the Committee of Adjustment Hearing on December 3, 2025.
140 m away · filed Aug 18, 2025 · Approved
29 Sharpe St · Minor variance
To construct a new two-storey detached dwelling with a front porch, rear deck, a front balcony and rear balcony. The existing dwelling will be demolished.
190 m away · filed Mar 25, 2025 · Approved
89 Claremore Ave · Minor variance
To construct a new two-storey detached building (duplex) with a front porch, front second storey balcony, rear ground floor deck and rear second storey balcony. The existing one-storey detached dwelling and detached garage will be demolished. NOTE: This application was previously deferred at the Committee of Adjustment hearing on April 9, 2025.
150 m away · filed Feb 25, 2025 · Approved
26 Natal Ave · Minor variance
To construct a new 2 storey dwelling with integral garage.
120 m away · filed Apr 23, 2024 · Approved
71 Vanbrugh Ave · Consent
To sever a portion of the lot for the purposes of a lot addition. Cross-Reference B0004/24SC, A0028/24SC, A0029/24SC and A0030/24SC.
60 m away · filed Feb 29, 2024 · Approved
71 Vanbrugh Ave · Minor variance
To construct a detached 2-storey duplex. Cross-Reference B0004/24SC, B0013/24SC, A0028/24SC and A0029/24SC.
60 m away · filed Jan 5, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.