Toronto address · Ward 9, Davenport
627 Lansdowne Ave
The City of Toronto has 9 building permits since 2017 (7 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Not started
Small residential project · Multiple projects
Revision No.1: Revise permit as issued 25 248911 BLD 00 SR to incorporate a basement secondary suite Proposal to convert existing detached triplex to a single family detached dwelling. Renovate and underpin basement, construct new front walkout, and new third floor addition.
Applied Sep 23, 2026 · Permit 25 248911 BLD (revision 01)
- Revision issued
Plumbing
Revision No.1:Plumbing - Proposal to convert existing detached triplex to a single family detached dwelling. Renovate and underpin basement, construct new front walkout, and new third floor addition.
Applied Sep 23, 2026 · issued Sep 25, 2026 · Permit 25 248911 PLB (revision 01)
- Ready for issuance
Drains and site services
Revision No.1:Drain - Proposal to convert existing detached triplex to a single family detached dwelling. Renovate and underpin basement, construct new front walkout, and new third floor addition.
Applied Sep 23, 2026 · Permit 25 248911 DRN (revision 01)
- Permit issued
Plumbing
Plumbing - Proposal to convert existing detached triplex to a single family detached dwelling. Renovate and underpin basement, construct new front walkout, and new third floor addition.
Applied Nov 4, 2025 · issued Dec 22, 2025 · Permit 25 248911 PLB
- Inspections under way
Heating and ventilation
HVAC - Proposal to convert existing detached triplex to a single family detached dwelling. Renovate and underpin basement, construct new front walkout, and new third floor addition.
Applied Nov 4, 2025 · issued Dec 22, 2025 · Permit 25 248911 HVA
- Inspections under way
Drains and site services
Drain - Proposal to convert existing detached triplex to a single family detached dwelling. Renovate and underpin basement, construct new front walkout, and new third floor addition.
Applied Nov 4, 2025 · issued Dec 22, 2025 · Permit 25 248911 DRN
- Inspections under way
Small residential project · Multiple projects
Proposal to convert existing detached triplex to a single family detached dwelling. Renovate and underpin basement, construct new front walkout, and new third floor addition.
Applied Nov 4, 2025 · issued Dec 22, 2025 · Permit 25 248911 BLD
- Closed
Small residential project · Interior alterations
Proposed conversion of existing illegal triplex to detached sfd. Remove provisions for living space in existing basement suite, remove partitions and doors subdividing ground and second floor suites, and remove additional kitchen at existing 2nd-floor. Work is being carried out to address deficiencies noted in WNP 20-123576
Applied Sep 6, 2022 · issued Nov 8, 2022 · completed Jan 27, 2026 · Permit 22 200026 BLD
- Cancelled
Small residential project · Interior alterations
Proposal for interior alterations to convert existing SFD-detached dwelling to 3 units.
Applied Apr 25, 2016 · completed Sep 18, 2017 · 2 homes added · Permit 16 145328 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear basement addition, a front basement walkout, a front porch, a rear ground floor deck, a front second floor balcony, a rear two-storey addition, a third-storey addition with a rear balcony, and to demolish the existing detached garage and replace it with a two-car gravel parking pad, abutting the laneway. Also, to permit a total of 4 dwelling units (fourplex) within the existing altered dwelling.
Decision: Approved (hearing Jun 8, 2022)
Filed Feb 28, 2022 · File A0255/22TEY
What’s planned nearby
Development sites within 500 m
- Under review
510-514 Lansdowne Avenue and 1293-1301 Bloor Street West
28 storeys · Mixed use
80 m away · Site plan · Under review · filed Aug 9, 2022
- Under review
33 storeys · 634 homes · Mixed use
210 m away · Site plan · Under review · filed Aug 30, 2021
- Under review
21 storeys · 861 homes · Residential
290 m away · Site plan · Under review · filed Nov 7, 2024
- Approved
1167-1175 Bloor Street West, 34-42 Brock Crescent and 90 Croatia Street
14 storeys · 52 homes · Mixed use
350 m away · Rezoning · Approved · filed Feb 9, 2026
- Under review
19 storeys · 325 homes · Mixed use
400 m away · Condominium · Under review · filed Nov 8, 2021
- Under review
13 storeys · Mixed use
440 m away · Site plan · Under review · filed Apr 22, 2022
Neighbours’ Committee of Adjustment files within 250 m
1286 Bloor St W · Minor variance
To alter the existing three-storey mixed use building by constructing a rooftop mechanical penthouse with rooftop access and a rooftop access enclosure above the third storey with a partially covered rooftop terrace and a trellis. The ground floor and partial ground floor mezzanine level will contain a commercial unit (art gallery and event space). The second storey will contain a multi-function commercial space that supports StepStones for Youth's programming and the provides amenity space for building residents (counselling rooms, a gym, a break room, and an open-concept collaboration space…
140 m away · filed Sep 2, 2026 · Postponed
613 Lansdowne Ave · Minor variance
To convert the existing two-and-one-half-storey detached dwelling into a houseplex containing two residential dwelling units, with a new rear second storey deck with a landing and stairs and a rear basement walkout. Also, to convert the existing two-storey ancillary building (a one-car garage) in the rear yard into an art studio occupying the first and second storeys. There will be a total of two dwelling units on the lot.
30 m away · filed Apr 13, 2026 · Approved
462 Lansdowne Ave · Minor variance
To legalize and to maintain the front one-storey addition (front porch enclosure) with stairs of the existing two-storey semi-detached dwelling, that was constructed without an authorized building permit.
90 m away · filed Mar 20, 2026 · Postponed
1281 Bloor St W · Consent
To obtain consent for the technical severance of the property for the purpose of re-establishing two mixed-use lots which merged on title.
90 m away · filed Mar 4, 2026 · Approved
1319 Bloor St W · Consent
To obtain consent to sever the property into two mixed-use lots and to create new easements/rights-of-way.
160 m away · filed Sep 3, 2025 · Approved
587 Lansdowne Ave · Minor variance
To alter the existing one-storey detached building (TTC traction power substation) by constructing a rear one-storey addition with a side (south) exterior platform and staircase to access this addition. Also, to replace the existing electrical transformers in the rear yard.
100 m away · filed Jun 13, 2025 · Approved
1319 Bloor St W · Minor variance
To permit the construction of the Bloor Lansdowne SmartTrack GO Station, which consists of the main entrance building (municipally known as 1325 Bloor Street West), and a maintenance building with bicycle parking, and a partially enclosed waste and recycling storage area (municipally known as 17 Dora Avenue). The station also includes a West Access Building as well as other station elements (including the platforms, waiting enclosures, a pedestrian tunnel to access the westerly platform, stairs and elevators) will be located within the rail corridor and not part of the subject lands (municipa…
160 m away · filed Apr 2, 2025 · Approved
1319 Bloor St W · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 589-2022) for a 31-storey and 35-storey mixed-use building, by permitting an increase in building height and total gross floor area, and to modify the building envelope (setbacks and step-backs). There will be a total of 1,100 residential dwelling units on this lot.
160 m away · filed Aug 16, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.