Toronto address · Ward 20, Scarborough Southwest
63 Eastville Ave
The City of Toronto has 6 building permits since 2017 (5 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Heating and ventilation
Rev 01 - Revise HVAC layout s per bubbled drawingsHVAC - Proposed addition and second unit in the basement
Applied Oct 3, 2025 · issued Oct 20, 2025 · Permit 24 161873 HVA (revision 01)
- Revision issued
Small residential project · Multiple projects
REVISION 01: Wall construction, structural members, structural details, stair, elevations and west wall/porch.Proposed addition and second unit in the basement
Applied Jan 28, 2025 · issued Feb 11, 2025 · Permit 24 161873 BLD (revision 01)
- Inspections under way
Heating and ventilation
HVAC - Proposed addition and second unit in the basement
Applied Aug 8, 2024 · issued Aug 23, 2024 · Permit 24 161873 HVA
- Inspections under way
Plumbing
Plumbing - Proposed addition and second unit in the basement
Applied Jun 19, 2024 · issued Aug 9, 2024 · Permit 24 161873 PLB
- Closed
Drains and site services
Drain - Proposed addition and second unit in the basement
Applied Jun 19, 2024 · issued Aug 9, 2024 · completed Mar 4, 2025 · Permit 24 161873 DRN
- Inspections under way
Small residential project · Multiple projects
Proposed addition and second unit in the basement
Applied Jun 8, 2024 · issued Aug 9, 2024 · Permit 24 161873 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
102 Eastville Ave · Minor variance
Proposal for front and rear yard landscape changes, widening of existing driveway and rear yard gazebo
240 m away · filed Sep 4, 2026 · Accepted
12 Harewood Ave · Minor variance
To construct a new two-storey dwelling with a rear deck and front porch. The existing one-storey dwelling would be demolished.
190 m away · filed Aug 29, 2025 · Approved
91 Eastville Ave · Minor variance
To demolish the existing one-storey dwelling and to construct a new two-storey dwelling.
170 m away · filed Oct 10, 2024 · Approved
90 Gradwell Dr · Minor variance
To construct a new 2-storey dwelling.
160 m away · filed Oct 31, 2023 · Approved
8 Harewood Ave · Minor variance
To demolish the existing dwelling and to construct a new 2-storey dwelling. Cross-Reference Consent Application B0040/23SC and Minor Variance Application A0227/23SC. NOTE: The consent application and the minor variance applications will be jointly considered by the Committee of Adjustment.
180 m away · filed Oct 12, 2023 · Approved
8 Harewood Ave · Consent
To sever the property into two residential lots. Cross-Reference Minor Variance Applications: A0226/23SC and A0227/23SC. NOTE: The consent application and the minor variance applications will be jointly considered by the Committee of Adjustment.
180 m away · filed Oct 12, 2023 · Approved
8 Harewood Ave · Minor variance
To demolish the existing dwelling and to construct a new 2-storey dwelling. Cross-Reference Consent Application B0040/23SC and Minor Variance Application A0226/23SC. NOTE: The consent application and the minor variance applications will be jointly considered by the Committee of Adjustment.
180 m away · filed Oct 12, 2023 · Approved
20 Brooklawn Ave · Minor variance
To demolish existing dwelling and to construct new 2-storey dwelling.
210 m away · filed Jun 20, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.