Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 11, University-Rosedale

63 Summerhill Ave

The City of Toronto has 4 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    To alter the existing 2½-storey semi-detached dwelling by constructing a rear three-storey addition with a balcony on second floor and one on third, intetrior alterations, underpinning the basement and a new rear detached garage

    Applied Mar 2, 2017 · issued Mar 13, 2017 · Permit 17 123399 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - To alter the existing 2½-storey semi-detached dwelling by constructing a rear three-storey addition with a roof top deck, rear deck, intetrior alterations and a new rear detached garage

    Applied Mar 2, 2017 · issued Mar 13, 2017 · completed May 17, 2018 · Permit 17 123399 HVA

    Closed
  • Plumbing

    Plumbing - To alter the existing 2½-storey semi-detached dwelling by constructing a rear three-storey addition with a roof top deck, rear deck, intetrior alterations and a new rear detached garage

    Applied Mar 2, 2017 · issued Mar 13, 2017 · completed May 17, 2018 · Permit 17 123399 PLB

    Closed
  • Small residential project · Other

    demolish detached garage in rear yard

    Applied Mar 2, 2017 · completed Mar 16, 2017 · Permit 17 123384 BLD

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 9 Woodlawn Avenue East and 1233 Yonge Street

    49 storeys · 724 homes · Mixed use

    210 m away · Site plan · Under review · filed Dec 29, 2021

    Under review
  • 49 Jackes Avenue

    217 homes · Residential

    230 m away · Condominium · Under review · filed Nov 4, 2021

    Under review
  • 1251-1311 Yonge Street

    47 storeys · 832 homes · Mixed use

    260 m away · Site plan · Under review · filed Apr 12, 2022

    Under review
  • 1212-1220 Yonge Street

    22 storeys · 185 homes · Mixed use

    280 m away · Site plan · Under review · filed Aug 31, 2022

    Under review
  • 1196-1210 Yonge Street

    14 storeys · 67 homes · Mixed use

    290 m away · Condominium · Under review · filed Nov 18, 2021

    Under review
  • 44 Price Street

    2 storeys · Not stated in the file

    330 m away · Site plan · Approved · filed Aug 19, 2025

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 67 Summerhill Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front covered porch with stairs.

    10 m away · filed Jul 29, 2026 · Hearing scheduled

  • 112 Summerhill Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a new front second storey dormer addition (above the existing front porch).

    230 m away · filed Jul 29, 2026 · Approved

  • 1177 Yonge St · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 286-83) for the seven-storey mixed-use condominium building, by reducing the number of parking spaces required off-site. The existing on-site underground parking spaces on Parking Levels P1, P2, and P3 will be maintained and unaltered. There will be a total of 182 parking spaces provided on-site, therefore, there is no longer a need to lease parking spaces from the Toronto Transit Commission (TTC) site in Area "D".

    190 m away · filed Sep 2, 2025 · Approved

  • 1133 Yonge St · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 286-83) for the six-storey commercial building, by reducing the number of parking spaces required off-site. The existing on-site underground parking spaces on Parking Levels P1 and P2 will be maintained and unaltered. There will be a total of 40 parking spaces provided on-site, therefore, there is no longer a need to lease parking spaces from the Toronto Transit Commission (TTC) site in Area "D".

    220 m away · filed Jul 11, 2025 · Approved

  • 1155 Yonge St · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 286-83) for the six-storey office building, by reducing the number of parking spaces required off-site. The existing on-site underground parking spaces on Parking Levels P1 and P2 will be maintained and unaltered. There will be a total of 47 parking spaces provided on-site, therefore, there is no longer a need to lease parking spaces from the Toronto Transit Commission (TTC) site in Area "D".

    200 m away · filed Jul 11, 2025 · Approved

  • 49 Woodlawn Ave E · Minor variance

    To legalize and to maintain the rear ground floor deck, which was constructed without an authorized building permit.

    100 m away · filed Dec 27, 2024 · Approved

  • 38 Mathersfield Dr · Minor variance

    To permit the existing two-storey ancillary building (detached garage abutting the laneway), by constructing a mezzanine on the second level. The existing ancillary structure (storage shed) attached to the detached garage will be maintained.

    180 m away · filed Sep 25, 2024 · Approved

  • 133 Summerhill Ave · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear three-storey addition with rear ground-level stairs. The existing rear detached garage will be maintained and unaltered.

    220 m away · filed Feb 6, 2024 · Refused

Everything planned in University-Rosedale

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.