Toronto address · Ward 7, Humber River-Black Creek
64 Arrow Rd
The City of Toronto has 6 building permits since 2017 (6 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Under review
Designated structure · Solar collector
Proposal for the installation of a rooftop 321kW-DC solar photovoltaic system at Univar Solutions,
Applied Aug 31, 2026 · Permit 26 228848 DST
- Revision issued
Addition or alteration · Multiple projects
Revision 02: Proposal to modify an existing flammable liquid filling room to be in compliance with OFC Part 4 and as approved by Toronto Fire Services.Revision #1 - to main roof beams and fire protection.
Applied Jun 6, 2023 · issued Aug 2, 2023 · Permit 17 239926 BLD (revision 02)
- Revision issued
Addition or alteration · Multiple projects
Revision #1 - to main roof beams and fire protection.
Applied May 23, 2018 · issued Jun 18, 2018 · Permit 17 239926 BLD (revision 01)
- Inspections under way
Heating and ventilation
HVAC - Proposed interior alterations to modify an existing flammable liquid filling room to be in compliance with OFC Part 4 and as approved by Toronto Fire Services. Please see cover letter for a detailed scope.
Applied Sep 27, 2017 · issued Jan 10, 2018 · Permit 17 239926 HVA
- Inspections under way
Addition or alteration · Multiple projects
Proposed interior alterations to modify an existing flammable liquid filling room to be in compliance with OFC Part 4 and as approved by Toronto Fire Services. Please see cover letter for a detailed scope.
Applied Sep 27, 2017 · issued Oct 26, 2017 · Permit 17 239926 BLD
- Permit issued
Fire and security upgrade · Sprinklers
Permit for upgrade to existing Fire Srinkler System.
Applied Jan 16, 2015 · issued Feb 19, 2015 · Permit 15 105142 FSU
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
None on file since 2017.
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.