Toronto address · Ward 11, University-Rosedale
64 Astley Ave
The City of Toronto has 10 building permits since 2017 (8 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Multiple projects
Revision to remove kitchen island and sink. Relocate sink and DW under sink.Rev 02 - Rotate 3rd floor stair skylight 90 degrees and add skylight in ensuite.Revision 1: Delete garage re-build, existing to remain.Proposal for interior alteration and third floor addition
Applied Aug 28, 2025 · issued Sep 12, 2025 · Permit 25 133838 BLD (revision 03)
- Revision issued
Small residential project · Multiple projects
Rev 02 - Rotate 3rd floor stair skylight 90 degrees and add skylight in ensuite.Revision 1: Delete garage re-build, existing to remain.Proposal for interior alteration and third floor addition
Applied Jul 28, 2025 · issued Aug 13, 2025 · Permit 25 133838 BLD (revision 02)
- Revision issued
Small residential project · Multiple projects
Revision 1: Delete garage re-build, existing to remain.Proposal for interior alteration and third floor addition
Applied Jul 4, 2025 · issued Jul 21, 2025 · Permit 25 133838 BLD (revision 01)
- Inspections under way
Heating and ventilation
HVAC - Proposal for interior alteration and third floor addition
Applied Apr 2, 2025 · issued Jul 10, 2025 · Permit 25 133838 HVA
- Inspections under way
Small residential project · Multiple projects
Proposal for interior alteration and third floor addition
Applied Mar 24, 2025 · issued May 14, 2025 · Permit 25 133838 BLD
- Inspections under way
Plumbing
Plumbing - Proposal for interior alteration and third floor addition
Applied Mar 24, 2025 · issued May 14, 2025 · Permit 25 133838 PLB
- Revision issued
Small residential project · Multiple projects
Revision # 01 - To excavate under the front porch and rear crawl space for new storage areas in the basement of the existing single family dwelling.Repair and underpin existing foundation and provide rough-in 3pc bathroom.
Applied Aug 8, 2016 · issued Oct 21, 2024 · Permit 09 122936 BLD (revision 01)
- Inspections under way
Small residential project · Multiple projects
Repair and underpin existing foundation and provide rough-in 3pc bathroom.
Applied Apr 2, 2009 · issued Apr 2, 2009 · Permit 09 122936 BLD
- Closed
Plumbing
Plumbing - Repair and underpin existing foundation and provide rough-in 3pc bathroom.
Applied Apr 2, 2009 · issued Apr 2, 2009 · completed Mar 18, 2025 · Permit 09 122936 PLB
- Closed
Drains and site services
Drain - Repair and underpin existing foundation and provide rough-in 3pc bathroom.
Applied Apr 2, 2009 · issued Apr 2, 2009 · completed Mar 18, 2025 · Permit 09 122936 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing two-and-one-half-storey detached dwelling by constructing a front two-storey bay window, a rear second storey sunroom addition, and a third storey addition with a rear covered deck (above the sunroom addition). Also, to construct a new one-storey ancillary building (garage), abutting Standish Avenue.
Decision: Approved (hearing Feb 12, 2025)
Filed Nov 26, 2024 · File A1015/24TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
33 Astley Ave · Minor variance
To construct a new three-storey detached dwelling with a two-car integral garage, a front covered porch, a front third storey balcony, a rear basement walkout, and a rear ground floor partially covered porch with stairs.
140 m away · filed Sep 8, 2026 · Postponed
49 Astley Ave · Minor variance
To construct a new three-storey detached dwelling an integral garage, a covered front porch with stairs, a rear first storey deck, a front third storey deck (above the southeast portion of the second storey roof), a rear third storey deck (above the second storey roof), a front basement walkout, and a rear basement walkout with a patio.
90 m away · filed Jun 3, 2024 · Approved
222 Rosedale Heights Dr · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition, a rear three-storey addition (the existing rear one-storey addition will be demolished), a side (east) second storey covered deck (above a portion of the rear ground floor addition), a rear third storey rooftop patio (above a portion of the rear second storey addition), a side (east) basement entrance accessed from a side (east) sloped driveway with a retaining wall.
230 m away · filed Mar 15, 2024 · Approved
59 Standish Ave · Minor variance
To construct a new three-storey detached dwelling with a front integral garage, a covered front porch, front and rear second storey balconies, a rear ground floor deck, and a rooftop green roof.
40 m away · filed May 19, 2022 · Approved
33 Standish Ave · Minor variance
To establish a parking space in the front yard.
120 m away · filed Jan 28, 2021 · Approved
298 Glen Rd · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, a front porch, a rear ground floor deck, and a full third storey addition.
200 m away · filed Jan 11, 2021 · Approved
18 Standish Ave · Minor variance
To construct a new two-storey detached house with an integral garage, a rear basement walkout and a rear ground floor deck.
170 m away · filed Jan 24, 2020 · Refused
55 Astley Ave · Minor variance
70 m away · filed Nov 21, 2019 · Withdrawn
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.