Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

64 Harvie Ave

The City of Toronto has 6 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - interior alterations & create basement unit

    Applied Apr 22, 2020 · issued May 25, 2020 · completed Oct 9, 2020 · Permit 20 136973 HVA

    Closed
  • Plumbing

    Plumbing - interior alterations & create basement unit

    Applied Apr 22, 2020 · issued May 25, 2020 · completed Oct 9, 2020 · Permit 20 136973 PLB

    Closed
  • Small residential project · Multiple projects

    Proposal for interior alterations to add a secondary suite in the basement.

    Applied Apr 22, 2020 · issued May 25, 2020 · completed Nov 4, 2020 · 1 home added · Permit 20 136973 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations/roof joist changes.

    Applied May 5, 2016 · completed Nov 10, 2020 · Permit 16 150743 HVA

    Cancelled
  • Plumbing

    Plumbing - Proposal for interior alterations/roof joist changes.

    Applied May 5, 2016 · completed Nov 10, 2020 · Permit 16 150743 PLB

    Cancelled
  • Small residential project · Interior alterations

    Proposal for interior alterations/roof joist changes and create basement walkout.

    Applied May 5, 2016 · completed Nov 10, 2020 · Permit 16 150743 BLD

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 75 Harvie Ave · Minor variance

    To legalize and to maintain the existing rear one-storey addition (ground floor enclosure), which was constructed without an authorized building permit.

    130 m away · filed Mar 13, 2025 · Approved

  • 136 Ascot Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by enclosing the rear ground terrace into habitable space. The existing one-storey ancillary building (attached garage in the rear yard, abutting Nairn Avenue) will be maintained and unaltered.

    120 m away · filed Dec 2, 2024 · Approved

  • 151 Ascot Ave · Consent

    To obtain consent to sever the property into two undersized residential lots.

    70 m away · filed Nov 20, 2024 · Approved

  • 151 Ascot Ave · Minor variance

    To construct a three-storey semi-detached apartment building with a front basement walkout, and front and rear balconies on the ground, second, and third levels. Also, to construct a two-storey semi-detached ancillary building (to contain one laneway suite) in the rear yard, abutting the laneway. There will be a total of five residential dwelling units on this lot (four units within the main building and one unit within the ancillary building).

    70 m away · filed Nov 20, 2024 · Approved

  • 151 Ascot Ave · Minor variance

    To construct a three-storey semi-detached building (fourplex) with a front basement walkout, and front and rear balconies on the ground, second, and third levels. Also, to construct a two-storey semi-detached ancillary building (to contain one laneway suite) in the rear yard, abutting the laneway. There will be a total of five residential dwelling units on this lot (four units within the main dwelling and one unit within the ancillary building).

    70 m away · filed Nov 20, 2024 · Approved

  • 75 Harvie Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear second storey addition that will be cantilevered beyond the existing ground floor level to provide a covered open space below.

    130 m away · filed Nov 13, 2023 · Approved

  • 79 Nairn Ave · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a new rear ground floor deck with stairs, and to reconstruct the front porch with stairs.

    150 m away · filed Oct 28, 2022 · Approved

  • 58 Nairn Ave · Minor variance

    To construct a rear one-storey ancillary building (detached garage) with a rooftop deck and an above-grade deck attached to the east side of the garage. This garage will be accessed from the public laneway (service lane).

    110 m away · filed Jan 20, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.