Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

649 Northcliffe Blvd

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Demolition

    Proposed demolition of a single storey dwelling to clear the way for a new apartment building development.

    Applied Apr 8, 2024 · issued Jun 19, 2024 · completed Apr 1, 2025 · 1 home removed · Permit 24 133625 DEM

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 2335 Dufferin St · Consent

    To obtain consent to sever the property into two non-residential lots, and to create new easements/rights-of-way.

    200 m away · filed May 28, 2026 · Deferred

  • 762 Vaughan Rd · Minor variance

    To construct a new 11-storey apartment building (with one mechanical penthouse above) containing 53 residential dwelling units, and one retail unit (at-grade), with a covered front entrance (the second to eleventh storeys will be cantilevered at the north portion of the building), a rear ground floor outdoor amenity space, a terrace on the north portion of the eighth storey, and a green roof on the southeast portion of the eleventh storey. No automobile parking spaces will be provided on the site.

    100 m away · filed Jun 9, 2025 · Approved

  • 754 Vaughan Rd · Minor variance

    To construct a new 10-storey apartment building (with one mechanical penthouse above) containing 60 residential dwelling units, and one retail unit (at- grade), with a covered front entrance (the second to eighth storyes will be cantilevered at the north portion of the building), two front ground floor patios, a rear ground floor outdoor amenity space, a terrace on the north portion of the eighth storey, and a green roof on the south portion of the tenth storey. No automobile parking spaces will be provided on this site.

    90 m away · filed Jun 9, 2025 · Approved

  • 729 Vaughan Rd · Minor variance

    To construct a new three-storey detached dwelling (triplex) with rooftop terraces. Also, to construct a one-storey attached two-car garage with a rooftop terrace, fronting Greyton Crescent. There will be a total of three residential dwelling units on this lot.

    150 m away · filed Jan 28, 2025 · Approved

  • 775 Vaughan Rd · Minor variance

    To alter the development standards for a mixed-use building (as approved under Site Specific Zoning By-law 818-2023) by increasing: the building height (from 38-storeys to 45-storeys), the maximum permitted projection of equipment used for the functional operation of the building, the maximum permitted total gross floor area and the maximum permitted encroachment of canopies and awnings. Also, to reduce the minimum required outdoor amenity space. The new 45-storey mixed-use building (including the mechanical penthouse) will have a total of 576 residential dwelling units.

    60 m away · filed Jul 28, 2024 · Refused

  • 189 Livingstone Ave · Minor variance

    Proposal for a detached garage laneway suite.

    180 m away · filed Oct 14, 2022 · Approved

  • 712 Vaughan Rd · Minor variance

    To alter the one-and-one-half-storey detached dwelling by constructing a second and third storey cantilevered addition above the existing dwelling, a rear three-storey addition, a front one-storey addition, front and rear second storey balconies, and front and rear third storey balconies.

    240 m away · filed Sep 26, 2022 · Approved

  • 617 Glenholme Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a third storey addition with a rear third storey deck, and to install a secondary suite within the basement with a basement walkout.

    230 m away · filed May 27, 2022 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.