Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

65 Church St

Cathedral Church Of St. James

The City of Toronto has 3 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Other

    Repair localized roof damages.

    Applied Mar 24, 2026 · issued Apr 28, 2026 · Permit 26 133767 BLD

    Permit issued
  • Drains and site services · Site service

    Proposal for exterior buried storm plus one catch basin (see also 09-197871 BLD)

    Applied May 13, 2013 · issued May 16, 2013 · Permit 13 167674 STS

    Permit issued
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Proposal to construct three-storey addition with one basement level below (1400m2), and interior alterations (2500m2) to existing parish hall which contains ancillary uses "Cathedral Church of St. James Parish Hall".Also see site plan approval application 09-133350, zoning review application 09-140023, and partial demolition permit 09-197912.

    Applied Aug 13, 2010 · Permit 09 197871 FSU

    Application on hold

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 89 Church St · Minor variance

    To permit a reduction in the number of required resident parking spaces and nine obstructed parking spaces, on-site.

    140 m away · filed Nov 4, 2024 · Approved

  • 71 King St E · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 552-2019(LPAT)), for the existing four-storey commercial/office building, by permitting the dwelling unit use through the conversion of the second and third storeys from commercial/offices uses into residential dwelling units (live/work units). Also, to permit a new residential lobby, facing King Street East. No visitor parking spaces and accessible parking spaces will be provided on-site. There will be a total of three commercial units and 11 residential dwelling units (7 dwelling units and 1 commercial unit on…

    170 m away · filed Aug 26, 2024 · Approved

  • 34 King St E · Minor variance

    To alter the development standards for the 33-storey mixed-use building (approved under Site Specific Zoning By-Law 1195-2022), by converting the required office use space into hotel use space (for 142 hotel suites and related facilities) on floors 1 through 10. The site is subject to a current Site Plan Control Application (File 2017 235087 STE 28 SA).

    220 m away · filed Jul 8, 2024 · Approved

  • 17 Leader Lane · Minor variance

    To alter the existing three-storey commercial building by constructing a complete fourth storey addition.

    200 m away · filed Aug 30, 2021 · Approved

  • 67 Adelaide St E · Minor variance

    To construct a partial fourth floor addition to the existing building for the conversion into a Municipal Shelter.

    60 m away · filed May 19, 2021 · Approved

  • 20 Lombard St · Minor variance

    To alter the redevelopment plan for a 46-storey mixed-use building, previously approved under Site-Specific By-laws 132-2016 (OMB) and 133-2016 (OMB), by creating additional dwelling units, converting residential parking spaces to commercial parking spaces and converting a bicycle parking area to a bulk parcel storage room.

    210 m away · filed Sep 21, 2020 · Approved

  • 80 Front St E · Minor variance

    APPLICATION FILED IN ERROR - VARIANCE NOT REQUIREDTo legalize and maintain a pergola over a rooftop patio on the 9th floor of 80 Front St E.

    240 m away · filed Dec 12, 2019 · Withdrawn

  • 25 Richmond St E · Minor variance

    To alter the redevelopment plan for the 46 storey mixed-use building approved under Site-Specific By-Laws 132-2016 and 133-2016, by relocating amenity space from floor 45 to floor 46, constructing two additional dwelling units on floor 45 (total 693 Dwelling Units), and increasing the gross floor area accordingly. Additionally, this application seeks to maintain the existing fifth storey addition and elevator overrun located atop the southeastern heritage building.

    240 m away · filed Oct 3, 2019 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.