Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 4, Parkdale-High Park

65 Methuen Ave

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing · Piping: SFD/Semi

    Emergency drain repair.

    Applied Aug 25, 2005 · issued Aug 25, 2005 · completed Jun 8, 2026 · Permit 05 174932 PSA

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 74 Harshaw Ave · Minor variance

    To construct a new two-storey detached dwelling with a front landing with stairs and a rear second storey balcony.

    50 m away · filed Jul 16, 2026 · Approved

  • 39 Humbercrest Blvd · Minor variance

    To alter the existing two-storey detached dwelling by constructing a two-storey east side addition with a covered front porch and a walkout basement, and a complete third storey addition with a balcony and juliet balcony on the west side. Also, to construct a rear detached ancillary building (to contain a two-car garage), abutting the laneway (Humbercrest Lane).

    150 m away · filed Dec 11, 2025 · Approved

  • 61 Methuen Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (including a basement extension below with a walkout), a rear deck with stairs, and new stairs for the front porch. Also, to convert the existing rear one-storey detached ancillary building (one-car garage) into a shed for storage purposes.

    20 m away · filed Aug 12, 2025 · Approved

  • 26 Brumell Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a partial three-storey addition, a front one-storey enclosed porch addition, a new front porch with stairs, a basement extension below grade, a rear basement walkout, a new rear deck with stairs, and rear second and third storey Juliet balconies.

    250 m away · filed Jul 2, 2025 · Approved

  • 35 Methuen Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front one-storey addition (porch enclosure).

    110 m away · filed May 30, 2025 · Approved

  • 64 Humberview Rd · Minor variance

    To alter the existing one-and-one-half-storey detached dwelling by constructing complete second and third storey additions. This current application is necessitated to seek further approval for the increased height of the roof level, from the previously approved Minor Variance Decision (under File Number A0571/24TEY).

    200 m away · filed May 30, 2025 · Approved

  • 64 Humberview Rd · Minor variance

    To alter the existing one-and-one-half-storey detached dwelling by constructing a complete second and third storey addition, a canopy over the existing front porch and a front third storey balcony. The existing parking space within the integral garage will be converted into habitable space.

    200 m away · filed Jun 26, 2024 · Approved

  • 41 Harshaw Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with a new ground level deck. The existing rear detached garage will be maintained and unaltered.

    120 m away · filed May 21, 2024 · Approved

Everything planned in Parkdale-High Park

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.