The City of Toronto has 17 building permits since 2017 (9 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Addition or alteration · Balcony/Guard repairs
Proposal for balcony repairs and guard replacement.
Applied Jul 6, 2026 · issued Jul 15, 2026 · Permit 26 196308 BLD
- Permit issued
Heating and ventilation
HVAC - Proposal to construct an on grade mechanical enclosure to house mechanical equipment and install mechanical genset in existing P1 storage room.
Applied Aug 15, 2022 · issued Dec 12, 2022 · Permit 22 190548 HVA
- Permit issued
Addition or alteration · Other
Proposal to construct an on grade mechanical enclosure to house mechanical equipment and install mechanical genset in existing P1 storage room.
Applied Aug 15, 2022 · issued Dec 12, 2022 · Permit 22 190548 BLD
- Closed
Addition or alteration · Garage Repair/Reconstruction
Proposal to construct a new storage room on existing level P1 in underground parking garage of the existing apartment building.
Applied May 11, 2022 · issued Jun 22, 2022 · completed Oct 26, 2022 · Permit 22 145329 BLD
- Inspections under way
Addition or alteration · Garage Repair/Reconstruction
Proposal for repairs to the garage slab in an existing apartment building - Level P1, Phase 2
Applied Nov 19, 2020 · issued Dec 24, 2020 · Permit 20 220396 BLD
- Closed
Addition or alteration · Fire damage
Rev 01: Finishes on all electrical panel walls to be removed complete floor to ceiling for smoke remediation. Where the wall tiles adjacent to the elevators have been removed, make good concrete walls around elevator doors, fire-rated doors, control boces, and adjacent wall joints. Unit 1521 remove and replace wall and ceiling finishes complete.Proposed fire damage repair to an existing apartment building.
Applied Oct 8, 2019 · issued Nov 7, 2019 · completed Mar 21, 2022 · Permit 18 271433 BLD (revision 01)
- Inspections under way
Heating and ventilation
HVAC - Fire damage - interior repairs to fire damaged components (finishes and reinstatement of the wall separating the garbage disposal froom from the chute/enclosure) and replacing the damaged garbage room exhaust ducts and fire dampers with the existing exhaust fan on the roof to remain.
Applied Sep 26, 2019 · issued Oct 11, 2019 · Permit 19 227313 HVA
- Closed
Addition or alteration · Interior alterations
Fire damage - interior repairs to fire damaged components (finishes and reinstatement of the wall separating the garbage disposal froom from the chute/enclosure) and replacing the damaged garbage room exhaust ducts and fire dampers with the existing exhaust fan on the roof to remain.
Applied Sep 26, 2019 · issued Oct 9, 2019 · completed May 4, 2020 · Permit 19 227313 BLD
- Closed
Plumbing · Other
Conversion of the heating system from electric to hot water heating. Installation of a new Boiler Plant, terminal heating equipment within the apartment units, and hot water distribution piping.
Applied Jun 26, 2019 · issued Jul 24, 2019 · completed Mar 11, 2020 · Permit 19 179111 PSA
- Closed
Heating and ventilation · Other
Conversion of the heating system from electric to hot water heating. Installation of a new Boiler Plant, terminal heating equipment within the apartment units, and hot water distribution piping. Mechanical work doesn't effect the structure of the building.
Applied Jun 26, 2019 · issued Jul 24, 2019 · completed Oct 14, 2025 · Permit 19 179120 MSA
- Closed
Heating and ventilation · HVAC: other group C buildings
replace existing ductwork UNIT B-23
Applied Feb 11, 2019 · issued Feb 14, 2019 · completed Oct 14, 2025 · Permit 19 114020 MSA
- Closed
Addition or alteration · Fire damage
Proposed fire damage repair to an existing aprartment building.
Applied Dec 21, 2018 · issued Jan 11, 2019 · completed Mar 21, 2022 · Permit 18 271433 BLD
Show 5 more permits
- Inspections under way
Fire and security upgrade · Other
There was a fire at this property. During the fire the fire department connection piping burst. The fire department connection and the piping must be replaced.
Applied Nov 12, 2018 · issued Dec 6, 2018 · Permit 18 255472 FSU
- Inspections under way
Addition or alteration · Garage Repair/Reconstruction
Proposal for P1 level garage floor repair.
Applied Jul 29, 2016 · issued Aug 3, 2016 · Permit 16 199196 BLD
- Inspections under way
Addition or alteration · Balcony/Guard repairs
Replacement of balcony railings for the North Portion of the apartment building. Phase 1 of Building "A" as per the site plan.
Applied Mar 17, 2010 · issued Mar 19, 2010 · Permit 10 133858 BLD
- Inspections under way
Plumbing
Plumbing - Install Fixtures--construct a one storey addition at southeast elevation of the 568 unit apt bldg known as 280 wellesley st e and will provide a retail store and three additional dwelling units see c of a final & binding - Addition(s)
Applied Nov 12, 2003 · issued Nov 12, 2003 · Permit 03 116226 PLB
- Closed (dormant)
Heating and ventilation
alter hvac system
Applied Mar 19, 2003 · issued Aug 13, 2003 · completed Jun 8, 2026 · Permit 03 116226 HVA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
238-280 Wellesley Street East, 77 Howard Street and 650 Parliament Street
47 storeys · 3,182 homes · Mixed use
120 m away · Site plan · Under review · filed Apr 27, 2022
- Approved
41 storeys · 460 homes · Mixed use
230 m away · Rezoning · Approved · filed Aug 25, 2025
- Under review
566-576 Sherbourne Street and 29-37 Linden Street
69 storeys · 872 homes · Residential
480 m away · Site plan · Under review · filed Apr 27, 2023
Neighbours’ Committee of Adjustment files within 250 m
100 Howard St · Consent
To obtain consent to a stratified severance and to create new easements/rights-of-way.
220 m away · filed May 23, 2025 · Approved
603 1/2 Parliament St · Minor variance
To legalize and to maintain the existing three-storey non-residential building, which was converted from a residential building, without an authorized building permit. The existing non-residential use (law office) will be maintained.
220 m away · filed Jul 18, 2024 · Approved
18 Laurier Ave · Minor variance
To alter the existing two-and-one-half-storey townhouse by constructing a rear third storey addition (dormer) with a rear third storey deck.
190 m away · filed Aug 11, 2021 · Approved
600 Parliament St · Minor variance
To construct new rear exterior stairs and add the use "Rooming House".
130 m away · filed Feb 24, 2021 · Approved
595 Parliament St · Minor variance
To convert the existing two-storey commercial building into a five storey mixed-use building by constructing a three-storey, 11-unit, residential addition above.
240 m away · filed Dec 20, 2019 · Approved
595 Parliament St · Minor variance
incomplete - close with refund less $100 admin fee
240 m away · filed Oct 25, 2019 · Withdrawn
2 Laurier Ave · Minor variance
To alter the semi-detached dwelling, by constructing, a third floor rear addition and roof deck. The rear two-storey deck will be replaced; and, the basement walkout will be demolished. Additionally, basement underpinning will occur as will interior alterations throughout.
210 m away · filed Jan 3, 2018 · Approved
600 Parliament St · Minor variance
To alter the existing 2½-storey mixed-use building by constructing a rear second and third storey addition.
130 m away · filed Sep 8, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.