Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 11, University-Rosedale

66 Collier St

The City of Toronto has 24 building permits since 2017 (8 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Proposal for interior alterations.

    Applied Sep 23, 2025 · issued Oct 28, 2025 · completed Aug 11, 2026 · Permit 25 229598 BLD

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations.

    Applied Sep 23, 2025 · issued Jan 5, 2026 · Permit 25 229598 PLB

    Inspections under way
  • Plumbing

    Plumbing - Proposed interior alteration of existing condo unit 2D

    Applied Sep 4, 2025 · issued Oct 7, 2025 · Permit 24 128325 PLB

    Permit issued
  • Addition or alteration · Interior alterations

    REV01: Proposed revision as per drawingsProposed interior alteration of existing condo unit 2D

    Applied Sep 4, 2025 · issued Sep 16, 2025 · completed Sep 22, 2025 · Permit 24 128325 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposed interior alteration of existing condo unit 2D

    Applied May 14, 2025 · issued Jun 10, 2025 · completed Jul 18, 2025 · Permit 24 128325 HVA

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to an existing 2-bdrm + study unit (D09), located on Level 9, for work to remove the study space & other minor renovations with the unit. [Existing Condominium Building]

    Applied Mar 28, 2025 · issued Apr 28, 2025 · completed Jul 18, 2025 · Permit 23 203657 HVA

    Closed
  • Addition or alteration · Interior alterations

    Revision: There are no changes to the drawings. The revision is necessary because the owner's name and unit number were incorrect. This request is solely to update the owner's name and unit number accordingly.

    Applied Mar 27, 2025 · issued Apr 1, 2025 · Permit 25 109921 BLD (revision 01)

    Revision issued
  • Plumbing

    Revision: There are no changes to the drawings. The revision is necessary because the owner's name and unit number were incorrect. This request is solely to update the owner's name and unit number accordingly.

    Applied Mar 27, 2025 · issued May 6, 2025 · Permit 25 109921 PLB (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    Proposal for relocating/ designing the existing kitchen and the bathroom plumping fixture layout.

    Applied Jan 28, 2025 · issued Feb 26, 2025 · Permit 25 109921 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for relocating/ designing the existing kitchen and the bathroom plumping fixture layout.

    Applied Jan 28, 2025 · issued Mar 10, 2025 · Permit 25 109921 PLB

    Inspections under way
  • Addition or alteration · Other

    Proposed rooftop railing guard replacement in existing residential condominium.

    Applied Jul 22, 2024 · issued Aug 28, 2024 · completed Sep 11, 2025 · Permit 24 185350 BLD

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to an existing 2-bdrm + study unit (D09), located on Level 9, for work to remove the study space & other minor renovations with the unit. [Existing Condominium Building]

    Applied Sep 18, 2023 · issued Jan 4, 2024 · Permit 23 203657 BLD

    Inspections under way
Show 12 more permits
  • Plumbing

    Plumbing - Proposal for interior alterations to a 1-bdrm+den unit (D14 or 14D) in an existing condominium building.

    Applied Nov 25, 2021 · issued Jan 10, 2022 · completed Sep 5, 2022 · Permit 21 154121 PLB

    Closed
  • Plumbing

    Revision 01: plumbing changes as per inspectors request

    Applied Jul 15, 2021 · issued Aug 10, 2021 · completed Jan 14, 2022 · Permit 20 222490 PLB (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to a 1-bdrm+den unit (D14 or 14D) in an existing condominium building.

    Applied May 13, 2021 · issued Jun 16, 2021 · completed Sep 8, 2022 · Permit 21 154121 BLD

    Closed
  • Plumbing

    Plumbing - Proposal to convert and existing suite into 2 suites on the 16th floor of the existing apartment building.

    Applied May 11, 2021 · issued Jun 10, 2021 · completed Jan 14, 2022 · Permit 20 222490 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal to convert and existing suite into 2 suites on the 16th floor of the existing apartment building.

    Applied May 11, 2021 · issued Jun 10, 2021 · completed Jan 14, 2022 · Permit 20 222490 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal to convert and existing suite into 2 suites on the 16th floor of the existing apartment building.

    Applied Nov 25, 2020 · issued Jun 7, 2021 · completed Feb 23, 2022 · Permit 20 222490 BLD

    Closed
  • Heating and ventilation

    HVAC - Remove existing sauna and change it to exercise room.

    Applied Jun 1, 2018 · issued Jun 14, 2018 · completed Nov 9, 2018 · Permit 18 150059 HVA

    Closed
  • Addition or alteration · Interior alterations

    Remove existing sauna and change it to exercise room.

    Applied Apr 27, 2018 · issued Jun 14, 2018 · completed Nov 21, 2018 · Permit 18 150059 BLD

    Closed
  • Heating and ventilation · Other

    Replacement of standard efficiency boilers, hot water heating boilers and chiller with high efficiency boilers and air cooled chiller.

    Applied Feb 20, 2018 · issued Mar 21, 2018 · completed Oct 8, 2025 · Permit 18 119106 MSA

    Closed
  • Addition or alteration · Garage Repair/Reconstruction

    Parking garage roof slab repair, waterproofing and re-landscaping.

    Applied Mar 19, 2015 · issued Jul 10, 2015 · completed Nov 21, 2018 · Permit 15 129485 BLD

    Closed
  • Addition or alteration · Garage Repair/Reconstruction

    Proposal for parking structure repairs to existing condominium building (400m2).

    Applied Aug 4, 2009 · issued Aug 7, 2009 · Permit 09 153216 BLD

    Inspections under way
  • Addition or alteration · Balcony/Guard repairs

    Proposal to upgrade all balcony railings.

    Applied Aug 27, 2008 · issued Oct 2, 2008 · completed Aug 10, 2026 · Permit 08 198123 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 874 Yonge St · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-Law 697-2021(OLT), for a new 50-storey mixed-use building (as approved under Committee of Adjustment Files A0612/23TEY and A0231/25TEY), by increasing the maximum total gross floor area, maximum building height (60.2 m to 61.25 m at the east side portion of the building), altering the minimum building setbacks, and reducing the required bicycle parking spaces. There will be a total of 267 residential dwelling units on this lot.

    180 m away · filed Jun 8, 2026 · Approved

  • 874 Yonge St · Minor variance

    To alter the development standards for the 50-storey residential building (approved under Site Specific Zoning By-Law 697-2021(OLT)), by increasing the permitted gross floor area, and the permitted encroachment of cladding and other similar façade treatments into the required minimum building setbacks.

    180 m away · filed Mar 31, 2025 · Approved

  • 820 Church St · Minor variance

    To alter the development standards for a 38-storey hotel building (as approved under Site Specific Zoning By-law 300-2023) by increasing the non-residential gross floor area, building height, and mechanical penthouse height. The new 42-storey hotel building will have a total of 192 hotel rooms.

    80 m away · filed Jul 9, 2024 · Approved

  • 874 Yonge St · Minor variance

    To alter the redevelopment plan for a mixed-use building approved under Site Specific By-law 697-2021(OLT) by permitting an increase in the building height, an increase in the total gross floor area, and the elimination of visitor parking spaces.

    180 m away · filed Jul 10, 2023 · Approved

  • 11 Yorkville Ave · Minor variance

    To alter Site Specific Zoning By-law 1685-2019 for the mixed-use building under construction by increasing the building height and number of storeys shown on Diagram 3 to range from 65-66 storeys (66-storeys in the area above penthouse suite 6206, located in the southeast corner of the tower floor plate area), increasing the total residential gross floor area and increasing the number of dwelling units in the building. Also, to reduce the amount of visitor automobile parking spaces and to reduce the long and short term bicycle parking spaces.

    240 m away · filed Mar 16, 2023 · Approved

  • 830 Church St · Minor variance

    To construct a four-storey service building to support TTC Bloor-Yonge Station and the tunnel infrastructure.

    80 m away · filed Mar 1, 2023 · Approved

  • 1 Yorkville Ave · Minor variance

    To alter the existing 57-storey mixed-use building through interior alterations by constructing a partial mezzanine above the ground floor units 110 to 114 for a wellness centre.

    220 m away · filed Feb 2, 2023 · Approved

  • 137 Collier St · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by enlarging the front third storey dormer and rear third storey terrace.

    150 m away · filed May 16, 2022 · Approved

Everything planned in University-Rosedale

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.