Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

66 Waverley Rd

The City of Toronto has 5 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services

    Drain - Including Back Water Valve - Proposal for multiple projects to an existing 3 storey SFD-detached dwelling. Scope of work includes a 2 storey rear addition, interior alterations, new front porch, new rear deck and a basement entrance.See also 16 163917 ZZC.

    Applied Dec 2, 2016 · issued Dec 2, 2016 · completed Dec 21, 2017 · Permit 16 192589 DRN

    Closed
  • Heating and ventilation

    HVAC - Proposal for multiple projects to an existing 3 storey SFD-detached dwelling. Scope of work includes a 2 storey rear addition, interior alterations, new front porch, new rear deck and a basement entrance.See also 16 163917 ZZC.

    Applied Oct 20, 2016 · issued Oct 25, 2016 · completed Dec 14, 2017 · Permit 16 192589 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for multiple projects to an existing 3 storey SFD-detached dwelling. Scope of work includes a 2 storey rear addition, interior alterations, new front porch, new rear deck and a basement entrance.See also 16 163917 ZZC.

    Applied Oct 20, 2016 · issued Oct 20, 2016 · completed Dec 21, 2017 · Permit 16 192589 PLB

    Closed
  • Small residential project · Multiple projects

    Revision - basement addition north foundation wall moved 3ft south with repose angle, joist direction change for cantilevered support, basement window relocated.

    Applied Oct 20, 2016 · issued Oct 27, 2016 · completed Dec 22, 2017 · Permit 16 192589 BLD (revision 01)

    Closed
  • Small residential project · Multiple projects

    Proposal for multiple projects to an existing 3 storey SFD-detached dwelling. Scope of work includes a 2 storey rear addition, interior alterations, new front porch, new rear deck and a basement entrance.See also 16 163917 ZZC.

    Applied Jul 18, 2016 · issued Aug 18, 2016 · completed Dec 22, 2017 · Permit 16 192589 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 54 Kenilworth Ave · Minor variance

    To legalize and to maintain the existing rear second-storey addition, which was constructed without an authorized building permit. Also, to alter the existing two-storey townhouse dwelling by constructing a front one-storey addition (verandah enclosure) and a rear ground floor juliette balcony.

    100 m away · filed Jul 17, 2026 · Hearing scheduled

  • 45 Kippendavie Ave · Minor variance

    To alter the existing three-storey detached dwelling by replacing the rear one-storey addition with a new three-storey addition, including a ground floor deck and a third storey terrace.

    230 m away · filed Jul 16, 2026 · Approved

  • 80 Waverley Rd · Minor variance

    50 m away · filed May 27, 2026 · Application withdrawn

  • 42 Waverley Rd · Minor variance

    To alter the existing two-storey detached dwelling by constructing third storey dormers (converting the attic into habitable space).

    100 m away · filed Jan 9, 2026 · Approved

  • 79 Kippendavie Ave · Minor variance

    To construct a new two-storey ancillary building (garden suite) in the rear yard. There will be a total of two residential dwelling units on this lot (one dwelling unit within the main dwelling, and one dwelling unit within the ancillary building).

    210 m away · filed Dec 18, 2025 · Approved

  • 54 Kenilworth Ave · Minor variance

    To construct a new two-storey detached ancillary building (containing one garden suite with a second storey balcony on the west side), in the rear yard. The existing two-storey detached dwelling will be maintained and unaltered. There will be a total of two residential dwelling units on this lot (one unit within the main building and one unit within the ancillary building). The existing garage will be demolished.

    100 m away · filed Dec 3, 2025 · Approved

  • 1982 Queen St E · Minor variance

    To construct a new six-storey mixed-use building with front balcony/terrace platforms (second storey to sixth storey) and rear balcony/terrace platforms (first storey to sixth storey). No parking spaces will be provided. There will be one commercial unit located on the ground floor, and a total of 10 residential dwelling units on this lot (one unit located on the ground floor, and nine units located on the second to sixth storeys).

    200 m away · filed Dec 2, 2025 · Approved

  • 1957 Queen St E · Minor variance

    To alter the existing three-storey detached mixed-use building by constructing a rear three-storey addition, complete fourth, fifth, and sixth storey additions, a rear ground floor integral garage, front fourth, fifth, and sixth floor terraces, rear second, third, and fourth floor balconies, and rear fifth and sixth floor terraces. Also, four short-term bicycle parking spaces will be provided in the rear yard. There will be a total of seven residential dwelling units, and one commercial unit on this lot.

    180 m away · filed Nov 14, 2025 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.