The City of Toronto has 30 building permits since 2017 (26 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Interior installation of pallet racking.

    Applied Sep 24, 2026 · Permit 26 243320 BLD

    Not started - express
  • Addition or alteration · Other

    Replacement of four roof top units with new support platforms on Bakery (Manufacturing Use)

    Applied Jun 17, 2026 · Permit 26 186088 BLD

    Under review
  • Heating and ventilation

    HVAC - Replacement of four roof top units with new support platforms.

    Applied Jun 17, 2026 · Permit 26 186088 HVA

    Issuance pending
  • Addition or alteration · Interior alterations

    Interior storage room and sprinkler room renovation, including the building's automatic sprinkler upgrades.

    Applied Jan 22, 2026 · issued Mar 2, 2026 · Permit 26 107910 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Interior storage room and sprinkler room renovation, including the building's automatic sprinkler upgrades.

    Applied Jan 22, 2026 · issued Mar 2, 2026 · Permit 26 107910 HVA

    Permit issued
  • Fire and security upgrade · Sprinklers

    Proposal for fire sprinkler system renovation.

    Applied Aug 11, 2025 · issued Aug 15, 2025 · Permit 25 208374 FSU

    Permit issued
  • Addition or alteration · Interior alterations

    REV 01: revision of a new room and platform on inside on the plant.Adding two exterior hoppers including bollards, concrete foundations and concrete truck loading pad.

    Applied Jun 9, 2025 · issued Sep 9, 2025 · Permit 24 222530 BLD (revision 01)

    Revision issued
  • Drains and site services · Site service

    To complete upgrades to the Site's existing wastewater treatment system incl:1. Installation of a new lift station and Equalization Tank2. Removal of existing centrifugal feed pumps and replacement with submersible pumps3. Installation of a pH Re-circulation SystemNOTE: Check related 25 124061 PLB 00 PS

    Applied Mar 3, 2025 · issued Apr 30, 2025 · completed Feb 9, 2026 · Permit 25 124081 STS

    Closed
  • Plumbing · Other

    To complete upgrades to the Site's existing wastewater treatment system incl:1. Installation of a new lift station and Equalization Tank2. Removal of existing centrifugal feed pumps and replacement with submersible pumps3. Installation of a pH Re-circulation SystemNOTE: Check related 25 124081 STS 00 DR

    Applied Mar 3, 2025 · issued Mar 31, 2025 · completed Feb 4, 2026 · Permit 25 124061 PSA

    Closed
  • Addition or alteration · Interior alterations

    Adding two exterior hoppers including bollards, concrete foundations and concrete truck loading pad.

    Applied Oct 6, 2024 · issued Nov 7, 2024 · Permit 24 222530 BLD

    Inspections under way
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Construct and install an imp on curb enclosure for new cooling tunnel. Construct a new steel platform for the new RTU.

    Applied May 30, 2023 · Permit 23 129988 FSU

    Application on hold
  • Heating and ventilation

    HVAC - Construct and install an imp on curb enclosure for new cooling tunnel. Construct a new steel platform for the new RTU.

    Applied Apr 6, 2023 · issued Jun 12, 2023 · Permit 23 129988 HVA

    Permit issued
Show 18 more permits
  • Addition or alteration · Other

    Construct and install an imp on curb enclosure for new cooling tunnel. Construct a new steel platform for the new RTU.

    Applied Apr 3, 2023 · issued Jun 12, 2023 · Permit 23 129988 BLD

    Permit issued
  • Addition or alteration · Interior alterations

    Proposal to construct new underground plumbing services and complete with new floor and trench drains

    Applied Nov 30, 2022 · issued Dec 14, 2022 · Permit 22 234706 BLD

    Permit issued
  • Plumbing

    Plumbing - Proposal to construct new underground plumbing services complete with new floor and trench drains

    Applied Nov 30, 2022 · issued Jan 6, 2023 · Permit 22 234706 PLB

    Inspections under way
  • Plumbing

    Plumbing - Construct a new hygienic separation wall between raw and cooked goods - bakery

    Applied Nov 9, 2022 · issued Dec 8, 2022 · Permit 22 225705 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Construct a new hygienic separation wall between raw and cooked goods - bakery

    Applied Nov 3, 2022 · issued Nov 29, 2022 · Permit 22 225705 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Construct a new wash bay, relocate hand wash stations.(Area of works= 30m2)2.Remove existing freezer panels walls and bulkhead, existing windows and existing door. Replace existing door and infill windows.(Area of work= 125m2)

    Applied Nov 2, 2022 · issued Dec 9, 2022 · Permit 22 222126 HVA

    Permit issued
  • Plumbing

    Plumbing - Construct a new wash bay, relocate hand wash stations.(Area of works= 30m2)2.Remove existing freezer panels walls and bulkhead, existing windows and existing door. Replace existing door and infill windows.(Area of work= 125m2)

    Applied Nov 2, 2022 · completed Sep 8, 2024 · Permit 22 222126 PLB

    Cancelled
  • Addition or alteration · Interior alterations

    Interior alterations to construct a new wash bay, relocate hand wash stations.(Area of works= 30m2) .Remove existing freezer panels walls and bulkhead, existing windows and existing door. Replace existing door and infill windows.(Area of work= 125m2). Construct storage platform (15m2).

    Applied Oct 26, 2022 · issued Nov 29, 2022 · Permit 22 222126 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Proposed installation of two (2) new Make-Up air units to address the building's existing pressurization issue. Each make-up air unit will be structurally supported on the roof and will provide supply air into the warehouse. Proposal also includes mechanical layout changes (270sq.m)

    Applied Jul 7, 2022 · issued Jun 6, 2023 · Permit 22 159937 HVA

    Inspections under way
  • Addition or alteration · Other

    Proposed installation of two (2) new Make-Up air units to address the building's existing pressurization issue. Each make-up air unit will be structurally supported on the roof and will provide supply air into the warehouse. Proposal also includes mechanical layout changes (270sq.m)

    Applied Jun 9, 2022 · issued Aug 16, 2022 · Permit 22 159937 BLD

    Inspections under way
  • Addition or alteration · Re-Roofing/Re-Cladding

    Proposal to do structural work to existing OWSJ

    Applied Jun 23, 2017 · issued Jun 27, 2017 · Permit 17 186325 BLD

    Inspections under way
  • Drains and site services · Inside and outside drains

    Proposal for inside sanitary drainage and exterior sewer system upgrades in the existing food prep building.

    Applied Mar 11, 2016 · issued Mar 21, 2016 · Permit 16 126765 STS

    Inspections under way
  • Fire and security upgrade · Fire alarm

    REV #1-revise sequence of operations due to converyor tunnelinstallation of fire alarm system for food processing plant

    Applied Sep 15, 2014 · issued Oct 23, 2014 · Permit 14 178597 FSU (revision 01)

    Revision issued
  • Fire and security upgrade · Fire alarm

    installation of fire alarm system for food processing plant

    Applied Jun 23, 2014 · issued Jul 23, 2014 · Permit 14 178597 FSU

    Inspections under way
  • Heating and ventilation · Other

    Revision 01 re; Location of ventilation fan. D.A.F. Room Ventilation.

    Applied Sep 9, 2013 · completed Aug 29, 2024 · Permit 11 319420 MSA (revision 01)

    Cancelled
  • Heating and ventilation · Other

    D.A.F. Room Ventilation.

    Applied Dec 1, 2011 · issued Jul 20, 2012 · Permit 11 319420 MSA

    Inspections under way
  • Plumbing · Other

    Install sanitary sump and piping outside the building. Note: Process effluent received from 300 Humber College Blvd.

    Applied Dec 1, 2011 · issued Jul 31, 2012 · Permit 11 319428 PSA

    Inspections under way
  • Plumbing · Other

    Proposal to modify the existing sanitary piping and install plumbing fixtures and D.A.F. Unit within the existing processing plant.

    Applied Aug 9, 2011 · issued Jul 31, 2012 · Permit 11 253917 PSA

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 25 Woodbine Downs Blvd · Consent

    To obtain consent to a lease for a term in excess of 21 years.

    140 m away · filed Dec 23, 2019 · Approved

Everything planned in Etobicoke North

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.