Toronto address · Ward 14, Toronto-Danforth
666 Queen St E
The City of Toronto has 6 building permits since 2017 (6 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Plumbing
REVISION - alterations to the basement as per the CofA decision 20 223165 MV, Final and Binding A1080/20TEY.Plumbing - Construct interior alterations to basement and ground floor
Applied May 3, 2021 · issued May 27, 2021 · Permit 20 209331 PLB (revision 01)
- Revision issued
Addition or alteration · Interior alterations
REVISION - alterations to the basement as per the CofA decision 20 223165 MV, Final and Binding A1080/20TEY.Construct interior alterations to basement and ground floor for chiropractic clinic (office)
Applied May 3, 2021 · issued May 25, 2021 · Permit 20 209331 BLD (revision 01)
- Revision issued
Heating and ventilation
REVISION - alterations to the basement as per the CofA decision 20 223165 MV, Final and Binding A1080/20TEY.HVAC - Construct interior alterations to basement and ground floor
Applied May 3, 2021 · issued May 27, 2021 · Permit 20 209331 HVA (revision 01)
- Inspections under way
Addition or alteration · Interior alterations
Construct interior alterations to basement and ground floor for chiropractic clinic (office)
Applied Oct 21, 2020 · issued Nov 17, 2020 · Permit 20 209331 BLD
- Inspections under way
Plumbing
Plumbing - Construct interior alterations to basement and ground floor
Applied Oct 21, 2020 · issued Nov 19, 2020 · Permit 20 209331 PLB
- Inspections under way
Heating and ventilation
HVAC - Construct interior alterations to basement and ground floor
Applied Oct 21, 2020 · issued Nov 19, 2020 · Permit 20 209331 HVA
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To alter the existing three storey mixed-use commercial residential building by providing interior alterations to the basement and first storey.
Decision: Approved (hearing Mar 31, 2021)
Filed Nov 27, 2020 · File A1080/20TEY
What’s planned nearby
Development sites within 500 m
- Under review
9 storeys · 85 homes · Residential
100 m away · Site plan · Under review · filed Sep 15, 2022
- Under appeal
15 storeys · Residential
190 m away · Rezoning · Under appeal · filed May 27, 2021
- Under appeal
18-40 Lewis Street, 21-53 Broadview Avenue and 344 Eastern Avenue
12 storeys · 340 homes · Mixed use
260 m away · Site plan · Under appeal · filed Jul 5, 2022
- Approved
6 storeys · 15 homes · Mixed use
340 m away · Site plan · Approved · filed Apr 28, 2023
Neighbours’ Committee of Adjustment files within 250 m
45 Baseball Pl · Minor variance
To permit a vehicle dealership use and vehicle service use (Downtown Automatic Group Cadillac) within the existing ground floor commercial unit of the mixed-use building.
80 m away · filed Feb 27, 2026 · Refused
630 Queen St E · Consent
To obtain consent to sever an existing retail unit located on the ground floor (within a 9-storey mixed-use building) into 4 separate ownership units. Also, to create new easements/rights-of-way and to maintain the existing easements/rights-of-way.
120 m away · filed Oct 10, 2024 · Approved
630 Queen St E · Minor variance
To be closed. This MV file was created in error at intake (it should have been a CO file).
120 m away · filed Sep 29, 2024 · Withdrawn
79 East Don Roadway · Consent
To obtain consent to sever the commercial/retail portion of a mixed-use development into 10 lots (one commercial parking area and 9 retail units) for ownership purposes. Also, to create easements/rights-of-way above and below-grade.
150 m away · filed Nov 1, 2023 · Approved
17 Kintyre Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third floor addition and a rear exterior ground floor stair with canopy at the first floor. A portion of the existing one-storey rear addition will be demolished.
170 m away · filed Dec 12, 2022 · Approved
677 Queen St E · Minor variance
To construct 15 additional residential dwelling units (within the Phase 2 mixed-use building), increasing the total number of permitted dwelling units (as cited in Site Specific Zoning By-laws 1363-2015 and 1364-2015) from 898 units to 913 units.
70 m away · filed May 19, 2022 · Approved
715 Queen St E · Consent
To obtain consent for a technical severance for the purpose of re-establishing two lots which merged on title.
180 m away · filed Aug 30, 2021 · Approved
685 Queen St E · Minor variance
To alter the interior of the existing three-storey apartment building and construct a rear five-storey addition resulting in a total of 26 units.
80 m away · filed Mar 4, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.